说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 三峡-葛洲坝
1.
Effects of Three Gorges and Gezhouba reservoirs on river water temperature regimes
三峡-葛洲坝梯级水库水温影响研究
2.
Application of Joint Optimal Dispatching in the Three Gorges-Gezhouba Cascade Hydro-Complex
联合优化调度在三峡-葛洲坝梯级枢纽的应用
3.
Application of automatic control and measurement system in TGP-GP step power station model
三峡-葛洲坝梯级电站模型中自动控制及测量系统的应用
4.
Status and Progress of Operation Techniques Integration on Cascade Project of Three Gorges and Gezhouba
三峡-葛洲坝梯级水利枢纽调度技术集成研究的现状与展望
5.
Both Gezhouba Project and Three-gorges dam are built in Yichang.
葛洲坝工程和三峡大坝都处在宜昌。
6.
Joint Dispatch of Three Gorges-Gezhouba Cascade Reservoirs
三峡—葛洲坝梯级枢纽联合调度运用
7.
Analysis on River Bed Evolution of Gezhouba Reservoir Since the Starting of Three Gorges Project
三峡工程动工来葛洲坝水库河床演变分析
8.
Packing Problem Research of Navigation Co-scheduling System for the Three Gorges Gezhouba Dam;
三峡—葛洲坝联合调度系统闸室编排研究
9.
United Dispatching Model and Arithmetic about Joint Sailing between Three-Gorges Dam and Gezhou Dam;
三峡—葛洲坝通航联合调度模型和算法的研究
10.
Design and Implementation of Navigation Scheduling Information System for Three-Gorge and Gezhou-Dam;
三峡—葛洲坝通航调度信息系统的设计与实现
11.
Priority Algorithm of Ship Scheduler in the Navigation Co-scheduling System;
三峡—葛洲坝联合调度中的船舶过坝优先级算法研究
12.
Numerical Simulation of Navigable Flow Conditions and Development of Shippings Dispatching System for the Three Gorges & Gezhouba Projects;
三峡葛洲坝通航水流数值模拟及航运调度系统研究
13.
Study on Influence of Three Gorges Project on the Navigation of Gezhouba Project and Yichang River Reach and Its Measurement;
三峡蓄水运用对葛洲坝通航与宜昌河段的影响及对策研究
14.
The overhaul mode research and information management of two hydropower stations in Ge Zhou Ba-the Three Gorges;
葛洲坝和三峡电站检修模式研究及其检修信息管理
15.
INFLUENCE OF FLOOD DISCHARGE AND SAND SCOURING OF THREE GORGES RESERVOIR AND GEZHOUBA RESERVOIR ON DEFORMATION OBSERVATION AT YICHANG SEISMOSTATION
三峡与葛洲坝水库泄洪冲沙对宜昌台形变观测的干扰
16.
Influence of Riverbed Evolution of the Lower Reach of the Three Gorge Project on the Channal Analyzed from Downstream Bed Erosion of Danjiangkou and Gezhouba Reservoir
从丹江口、葛洲坝水库下游河床冲刷看三峡工程下游河床演变对航道的影响
17.
On Sanjiang revetment destruction and its reinforcement measures at Gezhouba
葛洲坝三江防淤堤护坡破损原因分析及加固措施研究
18.
China Gezhouba Construction Group Corp.
中国葛洲坝水利水电工程集团公司