说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 电机布置
1.
Edification from a Single-shaft Layout of Gas-steam Combined Cycle Power Generators
燃蒸联合循环单轴发电机布置的启发
2.
Treatment on oil throw fault in lower guide bearing of generator of Shuibuya Hydropower Plant
水布垭水电站发电机下导轴承甩油问题处置
3.
Study on the Lay and Foundation Design of Cable Crane for Xiaowan Hydropower Station;
小湾水电工程缆机布置与基础设计研究
4.
Design of Drop-tilting Gates at Dahua Hydropower Station and the Layout of Hoist
大化水电站船闸卧倒闸门设计及启闭机布置
5.
Main Building Arrangement of Guodian Huozhou Supercritical Air-cooling Unites
国电霍州超临界空冷机组工程主厂房布置
6.
Screw hollow and motor spindle are distributed staggered and equally.
螺纹安装孔的位置与电装电机轴线成错开对称分布。
7.
It is studied the existing three kinds of bearing arrangement for the driving gear shaft of locomotive motor.
研究了现有的3种机车电机主动齿轮轴轴承布置方式。
8.
troughing idlers
(皮带机用)槽形布置托滚
9.
Emulational research on mechanical disposal of Xiaowan Hydropower Station placement based on abundance rule
基于充裕度规则的小湾水电站坝体浇筑机械布置仿真研究
10.
Economic Analysis of Side Bunker Room of Huaneng Haimen 1000MW Ultra Supercritical Thermal Power Plant
华能海门电厂1000MW超超临界燃煤机组侧煤仓间布置经济性分析
11.
Influence of traction device structure type and arrangement style on heavy load freight electric locomotive adhesion weight utilization rate
牵引装置的结构型式和布置对重载货运电力机车黏着重量利用率的影响
12.
The Arrangement Analysis of Belt Conveyer Driving by Single Drum
带式输送机单滚筒驱动装置布置分析
13.
amplidyne drive
电机放大机传动装置
14.
Optimal Deployment of Distributed Generation as Backup Generators
分布式发电作为备用电源的优化配置
15.
The article introduces the chassis layouts, heat management and electronic control of fuel cell vehicle based on the difference between fuel cell vehicle and traditional internal combustion engine.
根据燃料电池汽车与传统内燃机汽车的不同,介绍了燃料电池汽车的底盘布置、量管理、子控制。
16.
Space Arrangement of Basement Trench Commonly Shared by M & E Ducts and New Supporting Stand Application in Terminal Section of Shanghai Pudong International Airport Phase Ⅱ Project
上海浦东国际机场二期航站区工程地下室共同沟机电系统管线空间布置及新型支架的应用
17.
Production practice of an 800 kt/a sulphur-burning sulphuric acid plant with the air blower moved from downstream to upstream of drying tower
800kt/a硫磺制酸装置风机塔后布置改塔前布置的生产实践
18.
Main machinery equipment are arranged at the bottom.
轮机的主要机器设备均布置在舱底。