说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 模型验收试验
1.
Code for model acceptance tests of hydraulic turbines
GB/T15613-1995水轮机模型验收试验规程
2.
The Turbine Model Acceptance and Local Test of Longtoushi Hydropower Station
龙头石电站水轮机模型验收试验与现场测试
3.
Acceptance test on model for Kaplan turbine in Xixiayuan Project
西霞院工程轴流转桨式水轮机模型验收试验
4.
On Turbine Model Acceptance Test and Parameters of Feilaixia Hydropower Station
飞来峡水电站水轮机模型验收试验与参数
5.
Model acceptance test is applied to accept Yantan turbine performances. The model efficiency maximum is 92 percent in the completion of similar prototype.
岩滩水电站水轮机性能采用模型验收试验方式验收.其全模拟模型最高效率达到92%。
6.
Model Acceptance Test of the Baoying Pumping Station in the South-to-North Water Project
南水北调东线一期工程宝应泵站水泵装置模型验收试验成果分析
7.
This paper presents the turbine model acceptance test and the test results of Feilaixia hydropower station.
简要介绍了飞来峡水电站水轮机的模型验收试验的情况及结果。
8.
The parameter selection and model acceptance test of the Feilaixia Hydropower Station all have reached satisfied results.
飞来峡水轮机的参数选择和模型验收试验都达到了满意的结果
9.
Hydraulic Turbine Model Acceptance Test of No.2 Unit of Xinanjiang Hydropower Station
新安江水电厂2#机增容改造水轮机模型验收试验
10.
The runner model acceptance test of bulb tubular type turbine for Shapotou Hydropower Station
沙坡头水电站灯泡贯流机组水轮机转轮模型验收试验
11.
Main Parameter Selection of Unit & Model Acceptance Test on Turbine of Yantan hydropower Station
岩滩水电站机组主要参数的选择及水轮机模型验收试验
12.
Model Acceptance Test of the Pump Turbine of Hohhot Pumped Storage Power Station
呼和浩特抽水蓄能电站水泵水轮机模型验收试验
13.
acceptance test
验收试验;验收试验;接机考验;接收测试;接收试验
14.
Numerical Simulation and Experimental Research on Shrinkage of GF Reinforced PP;
GF增强PP成型收缩率的试验研究与数值模拟
15.
Study on Pull-out Test and Numerical Simulation of Newly Recoverable Anchor;
新型可回收式锚杆抗拔试验及数值模拟研究
16.
Shaking Table Test Model Design with Setback in Elevation for a Super High-Rise Building
某立面收进超高层结构振动台模型试验设计
17.
acceptance functional test
验收功能试验;验收功能试验;验收性能试验;验收性能试验
18.
The Acceptance Test of the Model Pump Systerm of Linjiaba Pumping Station in the Eastern Route First-stage Project of the South-to-North Water Transfer Project
南水北调东线一期工程蔺家坝泵站水泵模型装置验收试验