说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 三门峡站
1.
The Analysis on Approximate Cycle of Natural Yearly Runoff and Low Water Period in Yellow River Sanmenxia Station;
黄河三门峡站天然年径流量系列周期性分析及枯水段研究
2.
The Studies on the Operation Management of the Sanmenxia Hydropower Station;
三门峡水电站运营管理若干问题研究
3.
Application of Stochastic Time Series Method in Prediction of the Annual Water Inflow of Tongguan Station in Sanmenxia Reservoir
随机时间序列法在三门峡潼关站年来水量预测中的应用
4.
Sanxia hydro-power will supply electric power to Henan province after completion of construction.
三峡水电站建成后将向河南电网供电。
5.
Study on the Basal Station System for Water Quality Online Measurement in the Three Gorges Reservoir;
三峡水库水质在线监测基站系统研究
6.
Domestic Manufacture of Three Gorges Power Station 700 MW Hydro-generating Unit
三峡电站700MW水轮发电机组国产化实践
7.
Analysis of VGS Unit Thrust Bearing for Three Gorges Left-bank Power-plant
三峡左岸电站VGS机组推力轴承分析
8.
Application of positioning technology to ALSTOM generator set installation in Three Gorges hydropower station
三峡电站ALSTOM发电机组定位技术方案
9.
Concrete construction techniques for Three Gorges underground power hause
三峡水电站地下厂房混凝土施工技术
10.
Study on the Casting Process of the Three Gorges Turbine Blade
三峡电站水轮机叶片的铸造工艺研究
11.
The Rigidity and Strength Analysis on Hydraulic Turbine Runner of the Three Gorges Power Station(Right Bank)
三峡电站(右岸)水轮机转轮刚强度分析
12.
Features of the Alarm Mechanism of Computer Supervisory System of Three Gorges Right Bank Power Station
三峡右岸电站监控系统报警机制特点
13.
Layout and maintenance of construction control network of Three Gorges Underground Powerstation
三峡地下电站施工控制网布设与维护
14.
Exploration into PROFIBUS-DP based network communication for lifting equipment in The Three Gorges’ power plant
三峡电站起重设备PROFIBUS-DP网络通讯初探
15.
The Researching of Turbine Main Parameters Selection for Three Gorges Right Bank Power Station
三峡右岸水电站水轮机参数选择研究
16.
Function Design and Implementation of AVC in Three Gorges Right Bank Hydropower Station
三峡右岸电站AVC功能设计及实现方法
17.
Analysis of water level at Yichang Station due to daily storage of the Three Gorges power station
三峡电站日调节对下游宜昌站水位的影响
18.
Application of Arc-extinguishing and Over-voltage Protection Device at the Three Gorges Project Power Service Station and the Three Gorges Dam Area
消弧及过电压保护在三峡电源电站和三峡坝区35kV系统中的应用