说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 鲁布革水电站
1.
Comprehensive treatment of Fanai landslide of Lubuge hydropower station
鲁布革水电站发耐滑坡综合治理实施
2.
Dynamic Computation and Optimization for Trash Rack of Ludila Hydropower Station
鲁地拉水电站拦污栅结构动力计算与优化分析
3.
Treatment on oil throw fault in lower guide bearing of generator of Shuibuya Hydropower Plant
水布垭水电站发电机下导轴承甩油问题处置
4.
Study on Changheba Hydropower Station Flood Discharging Works Layout
长河坝水电站泄洪建筑物的布置研究
5.
Longtan hydropower control project layout and foundation treatment design
龙潭水电站枢纽布置及基础处理设计
6.
Study on the Management System Reform of Pumped-Storage Power Station in China;
我国抽水蓄能电站管理体制改革研究
7.
Overflow Cofferdam and Diversion Scheme Study for Qingjiang Shuibuya Hydropower Project;
清江水布垭水电站过水围堰及度汛方案研究
8.
Study on the Water Seal Layout at the Bulb Tubular Powe Station
灯泡贯流式水电站厂房水平止水布置研究
9.
Study on Stability of Placer Gold Goaf in Duomei in Ludila Hydropower Station after Storing the Water;
鲁地拉水电站蓄水后朵美砂金采空区的稳定性研究
10.
Study on Water Seal Layout at the Power House Monolith Joint of Power Station in River Channel;
河床式水电站厂房坝段横缝止水布置形式研究
11.
Final archives management of Shuibuya Hydropower Project;
水布垭水电站工程竣工档案的管理工作
12.
Practice of disperse-resettlement for Shuibuya Hydropower Station;
水布垭水电站库区移民分散安置的实践
13.
Key technology for construction of anti-scour wall by shaft method on the left bank of Shuibuya hydropower station
水布垭水电站左岸防淘墙竖井法施工关键技术
14.
Experimental study on shape optimization of three-in-one diversion tunnel in high-head hydropower station
高水头水电站“三洞合一”布置的体型优化试验
15.
Rockmass plastic deformation treatment for diversion tunnel of Budong HPP
布东水电站引水隧洞岩体塑性变形的处理
16.
Study on the layout pattern of new spillway structure of Tianqiao hydropower station
天桥水电站新增泄水建筑物布置型式研究
17.
Test of Surrounding Concrete of Steel Spiral Case Keeping Constant Internal Water Pressure in Pubugou Hydropower Station
瀑布沟水电站充水保压蜗壳结构模型试验
18.
Analyzing stator windings main protection of generator for Qingjiang Shuibuya hydropower station
清江水布垭电站发电机定子绕组主保护分析