说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 小浪底大坝
1.
Xiaolangdi Dam project on the Yellow River is 154 meters high.
黄河小小浪底大坝工程有154米高。
2.
Analysis and Assessment of Xiaolangdi Dam s Safety Monitor System;
小浪底大坝安全监测系统分析与评价
3.
Application of TCA system to the collimating line observation in Xiaolangdi dam
TCA系统在小浪底大坝视准线观测中的应用
4.
Research on Reconstructing the Wave Wall of Xiaolangdi Dam as Cultural Wall and Celebrity Street;
小浪底大坝防浪墙改建文化墙及名人街项目研究
5.
Relying on beautiful landscape, Jiyuan enjoys rich tourist resources including Xiaolangdi Dam, Wangwu Mountain, Wulongkou, etc.
济源山清水秀,风光旖旎,旅游资源丰富,有小浪底大坝、王屋山、五龙口等景点。
6.
Study on Seepage in the Dam Base of Xiaolangdi Project on Yellow River;
黄河小浪底水利枢纽工程大坝坝基渗流分析
7.
Analysis of properties and causes of deformation of the Xiaolangdi Hydro Project dam
小浪底水利枢纽大坝变形特性及成因分析
8.
Study on Solute Movement for Leakage Passage of Xiaolangdi Dam Foundation;
溶质运移示踪方法研究小浪底坝基渗漏通道
9.
Study on Contact Leakage Control Tests Between Cut-off Wall and Core of the Xlaolangdi Dam Foundation
小浪底水库坝基防渗墙与心墙接触渗流控制试验研究
10.
ENGINEERING GEOLOGICAL STUDY OF SOME WEAK INTERCALATIONS IN XIAO LANG DI DAMSITE NO. 3, HENAN
河南小浪底水库三坝址区某些软弱夹层的工程地质研究
11.
a heavy/light sea,ie with big/small waves
浪大的[小的]海面
12.
Flow Surface Construction at the Bottom in No.2 Diversion Tunnel of Double Arch Dam of Xiaowan Hydropower Station
小湾双曲拱坝2号导流底孔底板过流面施工
13.
Model test for dam bottom flushing outlet of DAPEIN(Ⅰ) Hydropower project
DAPEIN(Ⅰ)水电工程大坝冲砂底孔体型试验
14.
Synthetic Analysis on Baseline Survey in Xiaolangdi Reservoir Area;
小浪底库区本底调查过程综合分析与对策研究
15.
The huge waves swallowed the small boat and it sank shortly thereafter.
小船被巨浪淹没以后沉入海底。
16.
The Three Gorges Project on the Yangtze River and the Xiaolangdi Project on the Yellow River successfully completed damming.
长江三峡和黄河小浪底工程成功截流。
17.
The key water projects at the Three Gorges on the Yangtze River and at Xiaolangdi on the Yellow River
长江三峡和黄河小浪底水利枢纽工程
18.
Summary on the Assembly Technology of Generator Stator Core in Xiaolangdi Power Station
小浪底发电机定子铁心装配工艺总结