1.
On financing system reform of large and medium-sized water transfer projects in China;
论我国大中型调水工程投融资体制改革
2.
Investigation Report of Emigration of Large and Middle Hydraulic and Hydroelectric Projects in Shanxi Province;
山西省大中型水利水电工程移民调查报告
3.
Research on the Healthy Monitoring Model of Large Aqueduct in the Middle Route of South-to-North Water Transfer Project;
南水北调中线工程大型渡槽健康监测模型的研究
4.
Pre-stressed Aqueduct Structure Design about South-to-North Water Transfer Engineering;
南水北调中线工程大型渡槽三向预应力槽身结构设计
5.
Application of Large equipment for Concrete Lining of Canal in South-to-North Water Diversion
大型渠道混凝土衬砌设备在南水北调工程中的应用评述
6.
Seismic Damage Investigation on Large and Medium Sized Hydropower Projects in Wenchuan Earthquake Area
汶川地震灾区大中型水电工程震损调查及主要成果
7.
Study on Optimal Multi-stage Pumping Operation Models in Large-Scale Water Transfer Project;
大型引水工程梯级泵站优化调度模型研究
8.
Research on Simulation and Optimality for Large-Scale Multi-Stage Water Transfer Project;
大型梯级引水工程仿真与优化调度研究
9.
The Determination of Engineering Insurance Rate in Large-scale Water-transfer Project on the Basis of Venture Evaluation Theory;
基于风险评估的大型调水工程保险费率的确定
10.
Exterior Quality Assessment Methods of Large-scale Diversion Project
大型调水工程外观质量评定方法的探讨
11.
Water Source Diversion Management in the Middle Route of the South-to-North Water Transfer Project
南水北调中线水源工程调水管理研究
12.
Configuration Optimization of Wrapped Head of Cross Project of Anyang River and Middlle Route of South-to-North Water Diversion Project
南水北调中线与安阳河交叉工程裹头体型优化
13.
Modeling and Algorithm of Materials Planning and Dispatching MIS and DSS in a Large-scale Hydroelectric Project;
大型水电工程物资管理系统计划及调度模型与算法
14.
External load test on super-diameter pre-stressed concrete cylinder pipe(PCCP) in Mid-route of South-to-North Water Transfer Project
南水北调中线工程超大口径PCCP外载试验研究
15.
The Water Operation Research for Middle-Route of South-to-North Water Transfer Project;
南水北调中线工程水量调度仿真研究
16.
Application research for ground-source heat pump system applied to large port project
地源热泵空调在大型港口工程中的应用
17.
Study on type of air valve for PCCP pipeline and buried culvert of water conveyance system for Mid-route of South-to-North Water Transfer Project
南水北调中线工程PCCP及暗涵输水系统空气阀型式研究
18.
Model of Water-supplying Rate of Water Resources Project in Eastern Route Project for South-to-North Water Diversion;
南水北调东线水源工程供水水价模型研究