说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 工期-费用优化
1.
Research on Application of Time-Cost Optimization in Manufacturing Project of Port Machinery
工期-费用优化在港机制造项目中的应用研究
2.
Study on Optimization of Time-cost Based on Particle Swarm Optimization with Considering Secondary Critical Path;
考虑次关键路线的基于粒子群算法工期-费用优化研究
3.
Time-cost Optimization and Its Ant Colony Algorithm in Network Plan;
网络计划工期费用优化及其蚁群算法
4.
Period of Construction Cost Optimization Model and Algorithm Design About Project Progress Adjustment;
工程进度调整的工期—费用优化模型及算法设计
5.
Optimization of Expected Utility from Terminal Wealth and Consumption with Transaction Costs and Wages
带交易费及工资的终端资产和消费期望效用最优化
6.
Analysis of Safety Quality Cost Time in Network Plan for Trade-off Optimization;
安全质量费用工期在网络计划中的系统优化研究
7.
Optimize Expected Utility from Terminal Wealth and Consumption with Transaction Costs;
带交易费终端资产和消费的期望效用最优化
8.
Optimization Models for System Life Cycle Cost and Availability
系统寿命周期费用与有效度的优化模型
9.
Expected consumption utility maximization problems with partial information;
部分信息下期望消费效用最大的优化问题
10.
Application of Excel to Solve Time-cost Optimum in Engineering Network Drawing;
Excel应用于工程网络图中时间—费用整体优化
11.
METHOD FOR THE PIPELINE LAYOUT OF INDUSTRIAL SITE BASED ON THE OPTIMIZATION OF COST AND UTILITY
兼顾费用与效用优化的工业场地管线布置方法
12.
Low analysis about the application of LINGO in the optimization of the rources and the time limit for project
浅析LINGO软件在工期资源优化中的应用
13.
Research on the Dynamic Schedule Optimization of Construction Project on the Condition of Minimum Cost/Maximum Benefit.
费用最低/收益最大条件下的工程项目动态进度优化研究
14.
The Optimize Maintenance Model of Machining EquipmentBased on the Rule of Minimum Maintenance Expenditure;
关于最小维修费用的机械加工设备连续维修优化模型
15.
Analogy system for controlling quality time cost of construction projects
工程项目质量工期费用控制模拟系统
16.
The Optimizing Theory and Approaches to the Distribution of the Maintenance Cost on the Critical Facilities of an Enterprise;
企业关键设备维修费用的优化理论及优化方法
17.
The Model,Optimal Method and Application of Multi-period Utility System;
多周期公用工程系统运行的模型,优化方法与应用
18.
THE PROJECT COST-TIME OPTIMIZATION GRAPHICAL METHOD
工程计划成本—工期最优化的图示方法