说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 水电站大坝
1.
Sensitive Analysis of Temperature Control Mesures of the Concrete Dam for Xiangjiaba Hydropower Station;
向家坝水电站大坝混凝土温控措施敏感性分析
2.
Accident Analysis of Hydropower Dams in China and Countermeasures for Safety
我国水电站大坝事故分析与安全对策
3.
Analysis on dam safety monitoring data of Yanguoxia hydropower plant
盐锅峡水电站大坝安全监测资料分析
4.
Impact of 5.12 Earthquake on the Dam of Bikou Hydropower Station
“5.12”地震对碧口水电站大坝影响分析
5.
Design of the metal structures of water release system of the dam of DAPEIN(Ⅰ) hydropower station in Burma
缅甸DAPEIN(Ⅰ)水电站大坝泄水系统金属结构设计
6.
Reviews and prospects for the da m safety m anagem ent w ork of hydro stations in power system
电力系统水电站大坝安全管理工作回顾与展望
7.
Studies on Embankment Matials Test and Compacting Test of Shui Niujia Power-station Embankment Dam Project;
水牛家水电站大坝工程施工期筑坝材料试验及碾压试验研究
8.
Simulation and Optimization on the Dam Construction Schemes of Xiangjiaba Hydropower Station;
向家坝水电站大坝浇筑施工方案仿真分析与优化设计
9.
Dynamic Three-Dimension Visual Simulation for Xiangjiaba Hydroplant Dam Concrete Construction;
向家坝水电站大坝施工动态三维可视化仿真研究
10.
Study on the Application of Dam Deformation Monitoring at Hydropower Station Using GPS Technique;
GPS在水电站大坝变形监测中的应用研究
11.
The Construction and Quality Control of Concrete Cut-off Wall of Dam at Yele Hydropower Station;
冶勒水电站大坝防渗墙施工与质量控制
12.
Study on the Stability of the Abutment of Changheba Hydroelectric Power Station in Dadu River
大渡河长河坝水电站坝肩边坡稳定性研究
13.
Selection of Dam Type and Damsite for Dayakou Hydropower Station on Nanpeng River in Zhengkang County
镇康县南捧河大丫口水电站坝址坝型选择探讨
14.
The Study on the Geology Environment Evaluation of Daheba Hydro Power Station;
大河坝水电站库区地质环境影响评价
15.
Construction technology of RCC dam for Yeya hydropower project in Burma
缅甸耶涯水电站RCC大坝主要施工技术
16.
A Study on the Suitability of Building the High Rockfill Dam in the Underside Dam Site of the Changheba Hydroelectric Station in Daduhe River;
大渡河长河坝水电站下坝址建高(堆石)坝适宜性研究
17.
dam - diversion type hydroelectric power station
坝-引水混合式水电站
18.
HOW TO EVALUATE THE BENEFIT OF HYDROPOWER PROJECTS WITH HIGH DAMS AND LARGE RESERVOIRS IN CHINA
水电开发中如何评价高坝大库水电站的效益