说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 加固坝体
1.
Study on Dam Reinforcement by Vertical Horizontal Jointed Artesian Drainage
垂直、水平联合自流排渗法加固坝体的研究
2.
Study of Reinforcement by Raising and Expanding Volume of a Tailings Dam
某尾矿库加高扩容坝体加固处理研究
3.
The Study of Seepage Control and Consolidation Technique for Completed Earth Dams by Fracturing Grouting
土坝坝体劈裂灌浆防渗加固技术的研究
4.
Seepage-proof Strengthening Optimization Research of No.2 Auxiliary Dam of Xiangtan Power Plant
湘潭电厂二号副坝坝体防渗加固优化研究
5.
Evaluation and Analysis on the Main Dam Body Quality in the Danger Removal and Dam Reinforcement Project of Shencun Reservoir
申村水库除险加固工程主坝坝体质量评析
6.
MENDING THE WATER DAMAGE ENGINEERINGS BY TAKING THE GROUTED RUBBLE GRAVITY WALL TO FASTEN OLD DAM
用浆砌石重力墙加固旧坝体修复上海圹坝水毁工程
7.
reinforce a wall, bridge, dyke, etc
把墙、 桥、 堤坝等加固.
8.
Analysis on Numerical Simulation and Investigation of Reinforcement Method of New-old-structure Interfaces in Gate Engineering;
渠首加闸工程新旧坝体结合面数值仿真分析与加固措施研究
9.
Study on Reinforcement Technology of Earth-Rock Dam of Danjiangkou
丹江口大坝加高工程左岸土石坝加固技术研究
10.
Based on the above analysis and exploring tests, danger removal and reinforcement measures for the dam body are studied.
针对以上分析和勘察试验研究探讨了对坝体的除险加固措施.
11.
Cracks had appeared in the dam wall after the quake but workers had reinforced it with steel rods.
地震后水坝墙体出现了裂缝,但工人用钢筋加固了。
12.
Research of Overall Structural Safety and Numerical Simulation of Reinforcing Construction for Long-term Operating Gravity Dam;
长服役期重力坝整体安全性研究与加固施工数值仿真分析
13.
The Construction Effectiveness Commentary on Antiseepage Grouting Consolidation in the Dams of Cement Stone in Zhishan Reservoir;
纸山水库浆砌石坝体渗水灌浆加固施工效果评述
14.
Summary of Reinforcement Treatment of Abutment Rock Body in Xiaowan Hydropower Station
小湾水电站坝肩抗力岩体地质缺陷加固处理管理概述
15.
Anchorage of abutment near by dam toe-effective reinforcement method for high arch dam
垫脚加锚-高拱坝加固增稳的高效方法
16.
Research on Xiaowan Arch Dam s Abutment Stability and Reinforcing Treatment Measures;
小湾拱坝坝肩稳定及加固处理措施研究
17.
Analysis on Stress and Deformation of Jinping I High Arch Dam
坝基加固后锦屏一级高拱坝应力变形计算分析
18.
The Measures of the Risk Elimination & Reinforcement of Lingdong Reservoir Upstream Dam Slope
灵东水库大坝上游坝坡除险加固处理措施建议