Shuibuya Hydropower Project is the first step of cascade development on Qingjiang River . The project is located across the border between BaDong county EnShi State and ChangYang County of YiChang City.
水布垭枢纽工程是清江梯级开发的龙头电站,工程占地跨恩施州巴东县和宜昌市长阳县两县。
2.
A Feasibility Study of Hubei Qingjiang Shui Bu Ya Hydro-hinge;
湖北清江水布垭水利枢纽可行性研究
3.
Construction Technology of Large Cross-Section Diversion Tunnel of Shuibuya Water Conservancy;
水布垭水利枢纽特大断面导流隧洞施工技术
4.
Research on flood control investment allocation, money rising and return of investment of Shuibuya Water Conservancy Project;
水布垭水利枢纽防洪投资分摊及筹措和回报研究
5.
Longtan hydropower control project layout and foundation treatment design
龙潭水电站枢纽布置及基础处理设计
6.
Research on Plane Layout for the Approach Channel of Navigable Constructions in Yinpan Hydro-junction;
银盘水利枢纽通航建筑物引航道平面布置研究
7.
General Layout Design for Bajiangkou Hydropower Station in the Guijiang River of Guangxi
广西桂江巴江口水电站枢纽总体布置方案设计
8.
Environmental Protect Considerations of the Layout of Control Works of Shannipo Hydropower Station on the Beipan River
北盘江善泥坡水电站枢纽布置环保考虑
9.
Layout of Dongfeng Hydropower Station and Observation and Analysis of Arch Dam Character in the Early Impounding Stage
东风水电站枢纽布置及初期蓄水拱坝性态观测分析
10.
Study on Layout Design for Low-head Hydro-junction in River Channel with Inadequate River Width
河宽制约下低水头河床式水利枢纽布置设计探索
11.
Failure Mechanism of Muzhuping Landslide in Shuibuya Reservoir Area,Qingjiang River
清江水布垭库岸木竹坪滑坡失稳探讨
12.
Layout of Underground Powerhouse Complex and Support Design of Surrounding Rocks around the Group of Underground Chambers atDackaoshan Bydropower Station
大朝山水电站地下厂房枢纽布置和地下洞室群围岩支护设计
13.
Study on Arrange and Energy Dissipation Problem of Narrow Gap Bucket-stilling Box in Mid-low Head Sluice-dam Project;
中低水头闸坝枢纽布置与窄缝式戽式消力池消能问题的研究
14.
Exploration and Application of Three-Dimensional Design Method Integrated CAD/CAE Analysis Technic on the General Layout of Hydropower Project
集成CAD/CAE分析技术的三维设计方法在水电枢纽布置中的应用探索
15.
Analysis and Optimization of Underground Power House Arrangement of Xiabandi Key Water-Control Project, Xinjiang
新疆下坂地水利枢纽工程地下厂房布置的分析与优化
16.
Experiment Research on the Buildings Optimized Layout at the Shipment Gate for Qingyuan Water Conservancy Hub Project
清远水利枢纽工程船闸通航建筑物优化布置试验研究
17.
Overflow Cofferdam and Diversion Scheme Study for Qingjiang Shuibuya Hydropower Project;
清江水布垭水电站过水围堰及度汛方案研究
18.
Final archives management of Shuibuya Hydropower Project;
水布垭水电站工程竣工档案的管理工作