说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 二线船闸
1.
Study on filling and emptying system of Guiping second-line shiplock chamber wall structure
桂平二线船闸输水系统与闸室墙结构方案研究
2.
Arrangement of lock bottom long-culvert filling & emptying system of Guiping Second-lane lock
桂平二线船闸闸底长廊道输水系统布置研究
3.
Measurement and Analysis of Deformation of Huaiyin Secondary Ship Lock on Beijing-Hangzhou Canal in Its Overhauling
京杭运河淮阴二线船闸大修工程变形观测分析
4.
Hydraulic model test for lock bottom long-culvert filling & emptying system of Guiping Second-lane lock on the main navigation line of Xijiang River
西江航运干线桂平二线船闸闸底长廊道输水系统水力学模型实验研究
5.
Combining with the construction of the miter gates of Hanzhuang Second-line Shiplock in the Beijing-Hangzhou Grand Canal, this paper mainly introduces the installation technology for the miter gates and corresponding measures for quality assurance.
结合京杭运河韩庄二线船闸人字门的施工,介绍人字门主体结构的安装工艺及有关质量保证措施。
6.
Engineering design characteristics of Shiqiao third-lane lock on Beijing-Hangzhou Canal
京杭运河施桥三线船闸工程设计特点
7.
Bore pressure on the 2nd passage gate of ship lock of Jinghang Great Canal crossing the Qiantang River
京杭运河二通道钱塘江出口船闸闸门涌潮作用力研究
8.
The Non-Linear Finite Element Analysis of Navigation Lock-head Structure with the Application of Biot s Consolidation Theory;
应用Biot固结理论的船闸闸首结构非线性有限元分析
9.
Finite Element Analysis of Stoplog of Navigation Lock No.2 for Gezhouba Hydraulic Project
葛洲坝水利枢纽二号船闸叠梁门有限元分析
10.
The navigation facilities at the Shulkou project comprise a one-way three-flight ship lock and a oneway 2×500-ton ship lift.
水口水电站航运过坝采用一线三级船闸和一线2×500t垂直升船机。
11.
The lock keeper closed the lock gate.
船闸管理员关上了闸门。
12.
Fieldbus and Ethernet Technology Applied in Shiplock Control System
总线与以太网技术在船闸控制系统中的应用
13.
Study on the Analysis of the Navigational Capacity and Technical Reconstruction of the Yushan Second Line Shiplock;
虞山一线船闸通航能力分析与技术改造研究
14.
Difficulties and countermeasurs in layout plan of Shaobo Third-lane Lock of the Grand Canal
京杭运河邵伯三线船闸平面布置难点及对策
15.
Shut off the lower pipe ram, open the choke line and test the next ram and choke line.
关下部钻杆闸板,开放喷阀,试压第二个闸板和放喷泉管线。
16.
Preliminary Planning of Land Acquisition and Resettlement for NO.3 and No.4 Line Navigation Locks'Construction at Changzhou Hydro-junctions
长洲水利枢纽三线四线船闸建设征地移民安置初步规划
17.
Estimation and analysis on delays at busy waterway lock
繁忙船闸的船舶待闸时间分析与估算
18.
Through improvement of construction technology of chamfer of Zaohe River Third-line Lock's chamber wall, the inclined surface concrete quality has been well controlled.
通过对皂河三线船闸闸室墙倒角施工工艺的改进,斜面砼表面质量得到了较好的控制。