说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 黄河大桥工程
1.
Study on the Engineering Risk Management Method of Jinan Yellow River Cable-Stayed Bridge
济南黄河大桥工程风险管理方法研究
2.
Construction technology of pile cap construction in the water of the yellow river bridge in daguang high-speed way
大广高速黄河大桥水中承台施工技术
3.
Stimulation Analysis for Yanyan Lanzhou Yellow River Bridge Construction Structural Stability of the Entire Process;
兰州雁盐黄河大桥施工全过程结构稳定仿真分析
4.
The Study of the Design Plan on New Fenglingdu Bridge Across over the Yellow River and Approach Lines Connecting with Tongpu Railway
同蒲铁路新风陵渡黄河特大桥及引线工程设计方案研究
5.
The Construction of Bored Pile Underwater Platform of Wuzhong Huanghe Bridge
吴忠黄河特大桥钻孔桩水中平台施工
6.
More than two thousands data were obtained by the observations posted to the projects of Jiaozuo-Gongyi Yellow River bridge joint road.
通过对河南焦作至巩义黄河公路大桥连接线工程持续两年多的观测,获得了有关数据两万多个。
7.
Construction Quality Control of Large-diameter Cast-in-place Bored Pile of Huanghe Bridge
黄河大桥大直径钻孔灌注桩施工的质量控制
8.
Application of GPS Over-river Leveling to Bridge Project
GPS跨河水准在大桥工程中的应用研究
9.
The engineering geology evaluation of Baling river big Bridge side and slope stability
坝陵河大桥边坡稳定性工程地质评价
10.
The Substructure Construction Techniques of Jinan Yellow River Bridge on Beijing-Shanghai High-Speed Railway;
京沪高速铁路济南黄河大桥下部结构施工技术
11.
Construction technology of underwater foundation of piers for Dengkou Extra-large Bridge across the Yellow River in Baotou
包头镫口黄河特大桥水中墩基础施工技术
12.
Incremental Launching Technology of Steel Box Girder in Ji'nan Huanghe Bridge of Qingdao-Yinchuan Highway
青银高速济南黄河大桥钢箱梁顶推施工技术
13.
Workmanship for Hole Boring in Integral Panel Points of Steel Truss Girder of Zhongning Huanghe River Bridge
中宁黄河特大桥钢桁梁整体节点制孔工艺
14.
On pile cap open caisson construction scheme of super-large bridge of Zhongying expressway Yellow River in Ningxia
宁夏中营高速黄河特大桥承台沉井施工方案
15.
This bridge is the longest one over the Yellow River.
这座大桥是黄河上最长的大桥
16.
Construction Controlling for Repairing and Reinforcement of Ebian Daduhe Bridge
峨边大渡河大桥维修加固工程施工控制
17.
It is a huge job to control Yellow River erosion.
控制黄河水土流失是一项巨大工程。
18.
Xiaolangdi Dam project on the Yellow River is 154 meters high.
黄河小小浪底大坝工程有154米高。