说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 左岸电站
1.
Analysis of VGS Unit Thrust Bearing for Three Gorges Left-bank Power-plant
三峡左岸电站VGS机组推力轴承分析
2.
Technical Characteristics of the Stator Bar Main Insulation of Generators in the Three Gorges Left Bank Power Station
三峡左岸电站发电机定子线棒主绝缘技术特点
3.
Study on Dynamic Testing and Characteristics of Three Gorges Left Powerhouse;
三峡左岸电站厂房动态测试及动力特性研究
4.
Influence of Negative Discharge on Vibration of ALSTOM Units on the Left Bank of the Three Gorges Hydropower Station
负流量对三峡左岸电站ALSTOM机组振动的影响
5.
Causes of high temperature of VGS unit's thrust bearing in left bank power station and improvement measures
三峡左岸电站VGS机组推力瓦温偏高及改善措施
6.
Preliminary analysis on abrasion of turbine's flow parts of TGP's power station on left bank
三峡左岸电站水轮机过流部件磨蚀初析
7.
Stability Study of Talus Slides on the JinAnQiao Hydropower Station s Left Embank;
金安桥水电站左岸边坡崩塌体稳定性研究
8.
The Stability Analysis of the Fracturing and Deformation Body on the Left Bank of Jinping I Hydropower Station
锦屏一级水电站左岸变形拉裂体稳定性分析
9.
Study on Hydraulic Model Test of the Left Spillway in Miaojiaba Hydropower Station
苗家坝水电站左岸溢洪道水力模型试验研究
10.
Excavation of HF3 and HF & Anti-shear Cavity on the Left Bank of the Laxiwa Hydropower Station
拉西瓦水电站左岸HF3、HF7抗剪洞开挖施工技术
11.
Installation Technology of High Slope Tower Crane on Left Bank Energy Dissipation Area of Laxiwa Hydropower Station
拉西瓦水电站左岸消能区高边坡塔机安装技术
12.
Key technology for construction of anti-scour wall by shaft method on the left bank of Shuibuya hydropower station
水布垭水电站左岸防淘墙竖井法施工关键技术
13.
Stability Analysis of Cable-crane Platform Slope on Left Bank of Dagangshan Hydropower Station
大岗山水电站左岸缆机平台边坡楔体稳定分析
14.
3-D Finite Element Analysis on Seepage Field of Left Abutment of Xigu Hydropower Station
溪古水电站左岸三维渗流场有限元分析
15.
Stability Analysis and Estimation for Left Bank Slope of Tongwan Hydropower Station
铜湾水电站左岸高边坡稳定性分析与评价
16.
Survey Control in Construction of Long Inclined Shaft
溪洛渡水电站左岸泄洪洞开挖施工技术
17.
Layout Optimization of Left Bank Cutoff Wall of Laohuzui Hydropower Station in Tibet
西藏老虎嘴水电站左岸防渗墙布置方案优化
18.
Stability study on falling accumulation B_(20) on left bank of hydropower station
某水电站左岸B_(20)崩塌堆积体稳定性研究