说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 填挖方
1.
Automatic side-slope analysis algorithm of cutting-and-filling roads based on Digital Elevation Model(DEM)
一种基于数字高程模型的道路填挖方边坡自动解析算法
2.
balanced earthworks
填挖平衡的土方工程
3.
Development of Auto-Tracing Dividing Line of Earthwork Based on CASS
基于南方CASS的挖填方0界线自动追踪
4.
To reduce earthwork costs, the volume of the fills should be equal to the volume of the cuts.
为了降低土方工程的费用,填方量应等于挖方量。
5.
Seismic fortification for high-filled embankment slope or deeply digging side road cutting slope
高填方路基边坡或深挖方路堑边坡抗震设防
6.
Excavation and Fiu of Stonework of High Grade Highway in Mountainous and Hiuy Terrain
山岭重丘区高等级公路石方开挖与填筑
7.
Stability Analysis Method for Half Filling and Half Digging Roadbed in Mountain Area;
山区公路半填半挖路基稳定性分析方法
8.
Analyzing and Comparing the Methods of Digging and Filling Road Bank in Silt
在淤泥中大面积开挖及填筑路堤的方法探讨
9.
ESTIMATION OF CUT-FILL VOLUMES IN ROCK SLOPE ENGINEERINGBASED ON FRACTAL INTERPOLATION
基于分形插值的岩石边坡工程挖填方量估算
10.
Discussion about Shallow Burying Underground Excavation Method Selection in Plain Filling Soil
重庆地铁素填土中浅埋暗挖施工方案比选
11.
Wherever possible, the amount in a cut where earth is being removed should be equal to the amount needed for a nearby fill.
只要有可能,挖方的土方和附近填方所需的土方是相等的。
12.
The paper mainly discussed technical measure to raise strength of soil base and frost stability in frost area.
本文主要论述提高冰冻地区零填与挖方路段土基强度冰冻稳定性采取的技术措施。
13.
dual-3 shallow cut and cover tunnel
双程三线明挖回填式隧道
14.
Numerical Simulation Research of Construction of the Semi-filled and Semi-excavated Embankment;
半填半挖路堤施工过程数值模拟研究
15.
The Construction of High Fill and Deep Cut Soil Subgrade
高填深挖土质路基施工——离军高速十三标段路基填筑施工总结
16.
Study on Stability Mechanism for Half Filling and Half Digging Roadbed Slope;
半填半挖路基边坡稳定性力学机理研究
17.
Differential Settlement Analysis and Compaction Standard Research of Cut-fill Roadbed;
填挖交界路基差异沉降分析及压实标准探讨
18.
Finite Element Analysis of Geocell Dealing with Half-Filled and Half-Dug Road;
土工格室处治半填半挖路基的有限元分析