说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 江垭电站
1.
Jiangya underground powerhouse has 33 chambers in different size.
江垭电站地下厂房洞室群共有大小洞室33个。
2.
Monitoring and analysis of surrounding rock mass of underground powerhouse chambers of Jiangya Power Station
江垭电站地下厂房洞室围岩监测与分析
3.
Analyzing stator windings main protection of generator for Qingjiang Shuibuya hydropower station
清江水布垭电站发电机定子绕组主保护分析
4.
Overflow Cofferdam and Diversion Scheme Study for Qingjiang Shuibuya Hydropower Project;
清江水布垭水电站过水围堰及度汛方案研究
5.
Regulation quality parameter test technology of 460MW unit in Shuibuya Hydropower Station
清江水布垭电站460MW机组调节品质参数测试技术
6.
The PLC Controlling of the 500 kV Main Transformer Wind Cooling System in Shuibuya Hydropower Station in Qingjiang
清江水布垭电站500kV主变风冷系统PLC控制
7.
Difficult operating status of flood control type waterpower plants and its countermeasures;
防洪型水力发电企业的经营困境及对策——以江垭水电站为例
8.
Analysis of Problems and Defects of Electric Equipment of NO.2 Unit in Shuibuya Hydropower Station
清江公司水布垭水电站2号机组设备缺陷问题及分析
9.
Shuibuya Hydropower Project is the first step of cascade development on Qingjiang River . The project is located across the border between BaDong county EnShi State and ChangYang County of YiChang City.
水布垭枢纽工程是清江梯级开发的龙头电站,工程占地跨恩施州巴东县和宜昌市长阳县两县。
10.
Electric braking in application to generating sets of Qingjiang Shuibuya Hydropower Plant
电气制动在清江水布垭电厂发电机组的应用
11.
Treatment on oil throw fault in lower guide bearing of generator of Shuibuya Hydropower Plant
水布垭水电站发电机下导轴承甩油问题处置
12.
Final archives management of Shuibuya Hydropower Project;
水布垭水电站工程竣工档案的管理工作
13.
Practice of disperse-resettlement for Shuibuya Hydropower Station;
水布垭水电站库区移民分散安置的实践
14.
Key technology for construction of anti-scour wall by shaft method on the left bank of Shuibuya hydropower station
水布垭水电站左岸防淘墙竖井法施工关键技术
15.
Analysis of Excavation Construction and Dynamic Response on the Shuibuya Power Station Tunnel;
水布垭电站尾水隧洞施工过程分析与爆破动力研究
16.
Application of PSTA2003 Hydraulic Unit Condition Monitoring and Tracking Analysis System in Shuibuya Power Plant
PSTA2003状态监测及跟踪分析系统在水布垭水电站的应用
17.
Hunan jiangya Dam undertaken by Bureau of Water Conservancy and Hydroelectric Power Construction of Liaoning Province is one of the national priority projects of China during the Nineth Five-year Plan.
由辽宁省水利水电工程局承建的湖南江垭水库,是我国九.五期间重点工程。
18.
A Feasibility Study of Hubei Qingjiang Shui Bu Ya Hydro-hinge;
湖北清江水布垭水利枢纽可行性研究