说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 后注浆桩
1.
POST GROUTING PILE TECHNIQUE(5)--HE VERTICAL COMPRESSIVE BEARING CAPACITY OF POST GROUTING PILES
后注浆桩技术(5)——后注浆桩的竖向抗压承载力
2.
POST GROUTING PILE TECHNIQUE (8) --THE TECHNICAL AND ECONOMICAL BENEFITS OF POST GROUTING PILES
后注浆桩技术(8)——后注浆桩技术经济效益
3.
POST GROUTING PILE TECHNIQUE(1)--THE INVENTION AND DEVELOPMENT OF POST GROUTING PILES
后注浆桩技术(1)——后注浆桩技术的产生与发展
4.
POST GROUTING PILES TECHNIQUE(2)--TECHINQUE OF PRESSURE GROUTING AT BASE OF SLURRY-DRILLED PILES
后注浆桩技术(2)——泥浆护壁钻孔灌注桩桩端压力注浆工艺
5.
TECHNIQUE OF POST GROUTING PILE(7) --FACTORS AFFECTING THE VERTICAL COMPRESSIVE BEARING CAPACITY OF PILES BY TIP AND SKIN GROUTING
后注浆桩技术(7)——影响桩端桩侧联合注浆桩竖向抗压承载力的因素
6.
TECHNOLOGY OF POST-GROUTING PILES(3) --THE CONSTRUCTION TECHNIQUE OF GROUTING AT TIP OF AUGER-DRILLED PILES IN A DRY CONDITIONS
后注浆桩技术(3)——干作业钻孔灌注桩桩端压力注浆工艺
7.
Post Grouting Construction Technique for Bored Piles with Slurry-supported Wall
泥浆护壁钻孔灌注桩后压浆施工技术
8.
Study on Pile-Soil s Stress-Stain of Tubular Piles before and Back Grouting;
管桩桩底注浆前后桩土应力应变特性研究
9.
Research on Construction Technique and Working Mechanism of Bored Pile by Base Post-Grouting;
钻孔灌注桩桩桩端后压浆工艺与机理研究
10.
The Dynamical Examination and Judgement of Perfusion Stake Base with Jamming Slurry on Stake End;
桩端后压浆灌注桩桩基动力的检测与评定
11.
Function mechanism and bearing capacity calculation of post grouting of cast-in-place piles
灌注桩后注浆作用机理与承载力计算
12.
Analysis on Applying Post-grouting Technique in Bored Pile
后注浆钻孔灌注桩的工程实例与探讨
13.
The application of post-injecting method in bored pile engineering
后注浆法在钻孔灌注桩工程中的应用
14.
Post Grouting for Hand Dug Piles with the Pipe Driven at the Pile End
人工挖孔灌注桩桩底打管后注浆技术及应用
15.
The Use of Post-grouting Technique at the Tip of Bored Cast-in-situ Pile
钻孔灌注桩桩端后注浆施工技术的应用
16.
Bored Pile after Pile Grouting Technology and Construction Quality Control
钻孔灌注桩桩底后注浆技术及施工质量控制
17.
Impact of Post Grouting Process of Pile Bottom on Bored Pile Bearing Behavior
桩端后注浆工艺对钻孔灌注桩承载性状的影响
18.
Construction of 90 m Super Deep Bored Pile and Post-Grouting of Bottom Pile
90m超深钻孔灌注桩及其桩端后注浆的施工