说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 施工支洞
1.
the permanent shiplock construction in the first stage includes its excavation in the first stage,drainage works of the high slope in the first stage,construction adit of the water conveyance system.
一期工程包括一期开挖、高边坡山体排水一期工程和输水系统施工支洞三大标块。
2.
Application of Advance Support by Pipe-shed in Tunnel Construction
超前管棚预支护在隧洞施工中的应用
3.
The Construction Techniques for the Side-slope/Heading-slope Bracing Engineering of the Open-cut Highway Tunnel in a Certain City
某城市公路隧道明洞边/仰坡支护工程施工技术
4.
Construction technique for excavation and support of chambers and tunnels under unfavorable geological condition
不良地质条件下的洞室开挖及支护施工技术
5.
Study on Construction Method and Support Parameters of Chenggongling Tunnel Portal Section;
成功岭隧道洞口段施工方法与支护参数的研究
6.
Monitoring at Construction Period and Dynamic Reinforcement of Underground Power House Group;
地下洞室群施工期监测与动态支护设计研究
7.
Full-section Tunnel Construction Technique in Rock Masses and Its Support Alternatives;
岩体全断面隧洞施工技术及支护方案研究
8.
Construction Support and Geology Forecast of Weak Rock Large-span Long-diversion Tunnel
软岩大跨度长引水隧洞施工支护与地质预报
9.
Research and Application of Construction Skills to Excavation and Protection of Tunnel Segment in Deposit Loess Region
土质洞开挖及支护施工技术的研究与应用
10.
Nano-concrete construction technology for support lining of diversion tunnel for Jinping Hydropower Station Ⅱ
锦屏二级水电站引水隧洞支护喷纳米混凝土施工工艺
11.
This paper introduces the construction operation procedure of tunnel engineering in adverse geologic areas, which includes excavation, temporary support, concrete lining, and so forth.
介绍某隧洞工程不良地质洞段施工中的开挖,临时支护,砼衬砌等各项作业。
12.
Excavation and support techniques for high slope at entrance of diversion tunnel of Pankou Hydropower Station
潘口水电站导流洞进口高边坡开挖与支护施工技术
13.
INFLUENCE OF BLASTING ON EXCAVATION OF A NEW TUNNEL ADJACENT TO EXISTING TUNNEL
相邻洞室爆破施工对已有洞室的影响
14.
Technical Measures for Safe Excavating of the Upper Portal of the Head-Tunnel in Zhao City
皂市导流洞洞口段上层开挖施工安全技术措施
15.
The paper mainly describes the method of piling in pilot tunnelused in construction of the principal part of Dongdan Subway Station in Beijing.
主要介绍北京地铁东单车站采用洞桩支承法进行车站主体工程施工的方法。
16.
The Research about the Optimization of the Timbering Structure and the Monitoring to the Stability of the Wallrocks of the Wawu Mountain Hydroelectric Station during the Construction Period;
瓦屋山水电站引水隧洞施工期围岩稳定性监测及支护结构优化研究
17.
Monitoring and Measurement Technology of the Emergence of Shallow Buried Unsysmmetrical Loaded Small Guide Hole
浅埋偏压隧道小导洞出洞施工与监控量测技术
18.
Study on transportation system of long and large tunnel construction by TBM
长大隧洞掘进机施工洞内运输系统研究