说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 上游法尾矿坝
1.
Impact of After-Shock on the Stability of Tailing Dam Built by Upstream Method
余震动对上游法尾矿坝稳定性的影响研究
2.
Safety Management Technique and Accident-causing Analysis of Dam-failure in Upstream Tailings Pond
上游法尾矿库溃坝事故致因分析及安全管理技术研究
3.
Analysis of the Forms of Heavy Metals in the Soil Downstream of a Uranium Mine's Tailing Dam
某铀矿山尾矿坝下游土壤重金属形态分析
4.
Study on Antiseismic Design Method and Antiseismic Measures of Tailings Dam;
尾矿坝抗震设计方法及抗震措施研究
5.
Analysis on Shear Strength of Upstream Tailings under High Stress
高应力条件下的上游法尾矿砂土抗剪强度分析
6.
Study on Analysis Method of Stability of Tailings Dam during Earthquake and Its Application;
尾矿坝地震稳定性分析方法及其应用的研究
7.
Application of strength reduction finite element method to stability calculation of tailing dam
强度折减有限元法在尾矿坝稳定计算中的应用
8.
The Research on Hazard Index System of Tailing Dam Failing and Safety Assessment Methods
尾矿坝溃坝危险性指标建立及安全性评价方法的研究
9.
Safety Analysis of Tailing Dam in Tailings Stoping Process
尾矿回采过程中尾矿坝的安全性分析
10.
The FEM Numeric Analysis and Optimized Design of the Long Wangshan Gold Mining Tailing Dam
有限单元法在龙王山金矿尾矿坝优化设计中的应用
11.
Study on Assessment Model of Severity Degree of the Tailings Dam Failure Impact
尾矿坝溃坝后果严重度评价模型研究
12.
Numerical analysis of seepage flow field of Fengshuigou tailing dam of Angang mining
鞍钢矿业风水沟尾矿坝坝体渗流场数值分析
13.
Numerical Simulation of Mine Tailing Dam-Break Considering Sediment Deposition
考虑矿砂淤积的尾矿坝溃坝洪水数值模拟
14.
Development of GPS Deformation Monitoring System for Tailing Dams;
矿山尾矿坝体GPS形变监测系统研究
15.
Single Stack Test Study and Stability Analysis of Tailings Dam
尾矿排放单堆试验研究及尾矿坝稳定性分析
16.
Application of Strength Reduction Finite Element Method in Calculation of Tailling Dam Dynamic Stability
强度折减有限元法在尾矿坝动力稳定计算中的应用
17.
《Planning,Design and Analysis of Tailings Dams》
《尾矿坝的规划、设计和分析》(书)
18.
Mechanism and Process Simulation for Chemical Clogging of the Tailings Dam;
尾矿坝化学淤堵机理与过程模拟研究