说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 施工期渡汛
1.
Study on Concrete Face Rockfill Dam Construction Diversion Standard and Flood Passing Measures During Construction Period;
混凝土面板堆石坝施工导流标准及施工期渡汛措施研究
2.
Reinforcement of Cetian Reservoir construction in the flood season and flood regulation
册田水库除险加固工程汛期施工与洪水调度浅析
3.
Key Techniques for the Construction of the Pile Foundation for the Piers of the No.2 Jinjiang Bridge at Lujiawan
卢家湾锦江2号大桥水中桥墩基础汛期施工关键技术
4.
Simulation Analysis of Temperature and Stress of U-aqueducts
U形渡槽施工期温度模拟与应力分析
5.
Temperature Field Simulation of Caohe Aqueduct during Construction Period
漕河渡槽施工期温度场模拟仿真研究
6.
Research on the Measures of Thermostatic Control to Prevent cracking on the Large Scale Prestress Aqueduct During Construction Period
大型预应力渡槽施工期温控防裂措施研究
7.
Optimal Design on Gongboxia Hydro-Power Station Construction During Flood Perind;
公伯峡水电站施工度汛方案优化设计
8.
Study on Environmental Impact Monitoring in Construction Period in Nuozhadu Hydropower Plant
糯扎渡水电站施工期环境影响监测讨论
9.
Optimization on Substage-Zoning Filling Design and Simulation on Dam Construction System of Nuozhadu Project;
糯扎渡工程填筑分期分区优化与填筑施工仿真研究
10.
Construction Techniques of Diaphragm Wall Considering the Protecting of Flood Prevention Wall
基于防汛墙保护的地下连续墙施工技术
11.
Application of non-engineering measure in the flood control operation of mountain area
非工程措施在山区县防汛调度中的应用
12.
The Difficulties of Current Flood Control Work in Yulin and the Countermeasures
玉林市当前防汛工作的难点与应对措施分析
13.
Design of Flood-period Passing for Flood Retarding Gate in Nanxijiang Water Supply Works
楠溪江供水工程拦河闸施工度汛方案的设计与实施
14.
Construction Techniques of The First Stage Open Excavation at Spillway Tunnel Outlet in Left Bank of Xiluodu Dam
溪洛渡水电站左岸泄洪洞出口一期明挖施工技术
15.
A Breif Analysis of Quality Control of the Mud-gravel Flood Road Construction in Shulu Trunk;
舒庐干渠渠堤泥结碎石防汛道路施工质量控制浅析
16.
Construction Technology for Bored Pile Close to the Flood Wall through Riprap Layer
紧贴防汛墙并穿越抛石层的钻孔灌注桩施工技术
17.
Applicants for approval to install outdoor advertising facilities shall keep the facilities clean, tidy and in good condition, and shall make replacements and repairs whenever necessary.
并定期对户外广告设施进行安全检查,遇台风、汛期应当采取安全防范措施。
18.
WTO Transitional Period to Cope with China s Modern Logistics Measures;
WTO后过渡期谈我国现代物流应对措施