说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 架设T梁
1.
Person's word picking the pole method to install the T beam in the big bridge application
人字扒杆法(双钓鱼法)架设T梁在大桥中的应用
2.
Railway T-shaped Girder Erecting with Road Bridging Machine
公路架桥机架设铁路大吨位提速T梁
3.
On erecting railway 2201T form by using TJ168 bridge girder erection machine
TJ168型架桥机架设铁路2201型T梁的施工
4.
Drap Erection Construction for 30 m Prestressed T Girder in Maliu Middle Bridge
麻柳中桥30m预应力T梁拖拉架设施工
5.
The Safety Control 40 m T Frame in High Angle Bridge
大纵坡桥梁40m T梁架设安装的安全控制
6.
Constructional technique of erecting railway T beam by using highway bridge machine
使用公路架桥机进行铁路T梁架设施工技术
7.
Erecting technology and economic analysis of simple supported T-beams on 160km/h passenger/freight mixed railway lines;
时速160km客货共线铁路简支T梁架设工艺与经济分析
8.
It introduces the design and construction planning of30 m prestressed simple span T-beam bridge-braced machine in Hukou Bridge between Jiujiang- Jingdezhen highways.
简要介绍江西省九江—景德镇一级公路湖口大桥30米预应力简支T梁架桥机设计与施工方案。
9.
Hysteretic behavior study of steel beam-to-column T-stub connections
钢框架梁柱T型钢连接节点滞回性能的研究
10.
Validity of FRP Strengthening in Negative-Moment Area of Frame-T-Beam
论框架T形梁负弯矩区纤维布加固的有效性
11.
The Efficient and Convenient Appliance of Excel to the Design and Calculation of T-beams
EXCEL在T型梁设计计算中的简便应用
12.
Erect steel columns, beams, and joist - 1st and 2nd floors
架设钢柱、梁和托梁:一层和二层
13.
Erect steel columns, beams, and joist - 3rd floor and roof
架设钢柱、梁和托梁:三层和楼顶
14.
Investigation of Launching Technique for the PC Beam of the Overhead Light Railway in Chongqing City;
重庆城市高架轻轨PC梁架设技术研究
15.
Cost analysis of 24m double track box girders erection by bridging machine;
架桥机架设24m双线箱梁费用分析
16.
Construction Techniques for Assembling and Erecting Steel Truss Girder under Water with the False Work Method
膺架法拼装架设水中钢桁梁施工技术
17.
Design and Construction of 50m-span Fabricated Continuous T-shaped Beam
跨径50m装配式连续T型梁的设计与施工
18.
Technique and cost exploration of second line beam erection by making use of the existing line;
利用既有线架设二线梁的架设技术与造价探讨