说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 世行三期项目
1.
Peasant Household Investigation in FDPA;
林业世行三期项目运行中的农户监测
2.
On the Performance Evaluation Index System of Anhui Strengthening Agricultural Irrigation Project Phase III by the World Bank Loan
安徽省世行加灌三期项目绩效评价指标体系研究
3.
The World Bank s Project Cycle and the Procedures of Using The World Bank Loans;
世行项目周期和我国利用世行贷款程序
4.
Results of MHC Project with World Bank Loan implemented in Sanya City
三亚市实施世行贷款妇幼卫生项目效果分析
5.
Suggestions for the Preparation of World Bank Loaned Highway and Waterway Projects;
公路水运世行贷款项目前期工作实施建议
6.
Achievements made in second Loess Plateau Watershed Rehabilitation Project in Kongdong district project area;
崆峒区世行二期项目建设的成效与启示
7.
Benefit Analysis of the 1st Phase of Yih Ju League Soil and Water Conservation World Bank Loan Project;
伊盟水土保持世行贷款一期项目效益分析
8.
Large-scale Community Trade in Suburbs-The Example of Greenland PracticeⅢin Kunshan
城郊大型社区商业初探——以昆山绿地家世界三期项目为例
9.
Ponder Over the China Capacity Building for Highly Pathogenic Avian Influenza Prevention and Human Pandemic Influenza Preparedness Project Granted by World Bank Avian/Human Influenza Facility At Second Phase
对世界银行中国禽流感及人流感大流行防控项目二期设计的思考
10.
THE MID-TERM EVALUATION OF THE WORLD BANK LOAN PROJECT FOR SCHISTOSOMIASIS CONTROL IN ANHUI PROVINCE
安徽省世界银行贷款血吸虫病控制项目三年防治效果观察
11.
Results of implementation of World Bank loan maternal health project in Sanya City
三亚市应用世行贷款完善妇幼卫生项目效果分析
12.
The World Bank plans to establish the program soon in ten countries.
世界银行计划于近期在10个国家建立这样的项目。
13.
Benefit analysis of Erdos project area of Loess Plateau Watershed Reh abilitation Project;
鄂尔多斯市水土保持世行贷款二期项目效益分析
14.
Preliminary work of Loess Plateau Watershed Rehabilitation Project;
浅谈黄土高原水土保持世界银行贷款项目的前期工作
15.
About the Organization of Projects for the Aid-the-poor Loan of the World Bank A Research on its Extent of Satisfaction and Expectation;
世界银行扶贫贷款项目机构的满意度与期望值研究
16.
Post_evaluation of Urban Road ConstructionProject Financed by the World Bank
世界银行贷款项目——城市道路建设项目后评价
17.
initiating memorandum - IM [World Bank]
(项目的)初始备忘录(简写为IM)[世界银行]
18.
Feasibility Study of Project "Luomadashijie" of Helida;
合力达“骡马大世界”项目可行性研究