说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 地下洞室开挖
1.
Safety management for excavation of underground chambers and tunnels of Baise multipurpose dam project
百色水利枢纽地下洞室开挖安全管理
2.
Summary on the Excavation Method of Underground Cavern Chamber of Xiaowan Hydropower Station
小湾水电站工程地下洞室开挖方法小结
3.
Study on Unloading Deformation Mechanism and Stability of Excavating Surrounding Rock Mass of Large Underground Caverns;
大型地下洞室开挖围岩卸荷变形机理及其稳定性研究
4.
Finite Element Analysis of Thermal-Fluid-solid Coupling for Large Underground Cavern;
特大断面地下洞室开挖的热流固耦合有限元分析
5.
Studies on Being-influenced and Protective Measures of One Issue of Project by the Excavating of Underground Hole Room;
漫湾水电站二期工程地下洞室开挖对一期工程的影响及保护措施研究
6.
Numerical Simulation for Excavation of Underground Caverns Under High Geostress Conditions
高地应力下地下洞室群开挖过程的数值模拟
7.
Excavation technology of three large chambers at Longtan Hydropower Station
龙滩水电站地下三大洞室开挖技术浅析
8.
Construction technique for excavation and support of chambers and tunnels under unfavorable geological condition
不良地质条件下的洞室开挖及支护施工技术
9.
A Study on Numerical Simulation of Underground Caves Excavation and Engineering Application;
地下洞室群开挖数值仿真研究与工程应用
10.
Boundary Element Method and its Application to Three-dimensional Underground Engineering
应用边界元方法求解地下洞室三维开挖问题
11.
Cavern Excavation Method for Underground Powerhouse Complex at Xiangjiaba Hydropower Station
向家坝电站地下厂房系统洞室开挖方法
12.
The Rock Stability Analysis of Underground Powerhouse Excavation at a Power Plant
某大型地下厂房洞室开挖围岩稳定性研究
13.
The Option of Excavation Sequence of Large-sized Underground Cavern and the Research of Construction Technique of Underground Factory;
大型地下洞室群开挖顺序选择及地下厂房施工技术研究
14.
Study on the Stability Induced by Stepped Excavations and Rheological Effect of Underground Cavern Groups in High In-Situ Stress Areas
高地应力条件下大型地下洞室群分步开挖稳定性及流变效应研究
15.
Stability Analysis of Surrounding Rock of Sanliping Underground Powerhouse Group after Excavation
三里坪水电站地下厂房洞室群开挖后围岩稳定性分析
16.
Numerical analysis of excavation and anchorage effect on complex underground caverns of a hydropower station with FLAC~(3D)
基于FLAC~(3D)的某水电站大型地下洞室群开挖及锚固效应数值分析
17.
STUDY ON EXCAVATION DISTURBED ZONE IN SURROUNDING ROCK OF TUNNEL WITH VARIOUS TBM DRIVING RATES
不同TBM掘进速率下洞室围岩开挖扰动区研究
18.
Research on Forecasting and Evaluation of Overbreak as Well as Underbreak in Jointed Rock Mass Openings;
裂隙岩体地下洞室超欠挖预测及评价研究