说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 高炉上料
1.
Charging and Weighing Error Compensation System for No. 3 BF Xin-Yu Steel Works
新钢3~#高炉上料和称量误差补偿系统
2.
Reconstruction and Application in Taigang 300m~3 Blast Furnace Charging System;
300m~3高炉上料系统改造及应用
3.
CAD Mapping of Blast Furnace Loading Pipe Based on VB
基于VB的高炉上料管展开图的CAD绘制
4.
The Production and installation of Skew Bridge of the Feeder of 450m~3 Blast Furnace
450m~3高炉上料机斜桥的制作与安装
5.
The Design and Research for Feeding Raw Materials Automatic Control System Based on the CAN Networks;
基于CAN总线网络的高炉上料自动控制系统研究
6.
Design of alteration to the automatic control system of feeding on the furnace;
新钢7号高炉上料生产自动控制系统改造设计
7.
Application of the S7-200 PLC in the Control System of the Feed-in Raw Materials in a Blast Furnace;
西门子S7-200PLC在炼铁高炉上料控制系统中的应用
8.
Xuanhua Steel's Blast Furnace on the 6th-controlled System Upgrades and Optimization
宣钢六号高炉上料自控系统升级及优化
9.
An Instance of Technical Renovation of Automatic Control System with the Material Feeding via the Trough Bottom for the No.1 Blast Furnace;
高炉槽下上料自动控制系统技改一例
10.
THE APPLICATION OF MULLITE CAST REFRACTORY WITH HIGH STRENGTH AND HIGH ALUMINA FOR CONTINUOUSLY HEATING FURNACE
高强高铝莫来石浇注料在连续加热炉上的应用
11.
bell charging equipment
料钟装料设备(高炉)
12.
blast furnace raw material charging system
高炉供料和装料系统
13.
Application of a Full-digit Thyristor Converter in BF Bell
全数字晶闸管变流器在高炉料钟上的应用
14.
"Zero Under-blow" Optimization of the Automatic Feeding System for Jigang's 1750m~3 BF
济钢1750m~3高炉“零慢风”上料自动化系统的优化
15.
The new methods of burden distribution with width burden in a bell-less top blast furnace
高炉无钟炉顶按料流宽度布料新方法
16.
high-density high-conductivity charge
高密度高导热性炉料
17.
When the circumference of the large bell is loaded by the small bell, the large bell is opened and the stock is dropped into the furnace.
大料钟的圆周都装上炉料后,大料钟降下,炉料便装入炉内。
18.
MATHEMATICAL MODEL OF BURDEN DISTRIBUTION FOR BELL-LESS TOP OF BLAST FURNACE
高炉无料钟布料炉料分布预测模型的开发研究