说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 主剪应力
1.
New Development in Strength Theory-Square Principal Shear Strength Theory;
强度理论的新发展——谈平方主剪应力强度理论
2.
The shear stress in interver tebral disc mainly distributed in fibrous rings.
②椎间盘的剪切应力主要分布在纤维环。
3.
Study on Shear Lag Effect in Flat Steel Box Girder of a Cable-stayed Bridge
斜拉桥扁平钢箱主梁剪力滞效应研究
4.
Shear Lag Effects of Cable-stayed Bridge with П-shape Cross-section Main Girder
П形截面主梁斜拉桥剪力滞效应分析
5.
A method for calculating active earth pressure considering shear stress
考虑剪应力作用的挡土墙主动土压力计算
6.
Research on the Shear Lag Effect of Main Girder with Single Box and Triple Cells Used in Cable-stayed Bridges;
斜拉桥单箱三室主梁的剪力滞效应研究
7.
Research on Shear Lag Effect in Box Girder of Cable-Stayed Bridge with Single Tower and Single Cable Plane;
独塔单索面斜拉桥箱形主梁剪力滞效应研究
8.
Research on the Shear Lag Effect of Beams of Cable-Stayed Bridges with Usual Cross Sections;
斜拉桥常用截面形式主梁的剪力滞效应研究
9.
stress-controlled direct shear apparatus
应力控制式直接剪力仪
10.
octahedral shearing-stress plasticity condition
八面体剪应力塑性条件
11.
maximum shear stress yield criterion
最大剪切应力屈服条件
12.
the shear changed the quadrilateral into a parallelogram.
外力使物体发生剪应变。
13.
Effect of Orientation of Principal Stress on the Undrained Behavior of Saturated Sand under Monotonic Shearing
饱和砂土不排水单调剪切特性试验研究——考虑剪切过程中变化的总主应力方向的影响
14.
Construction Simulation Analysis and Shear Lag Analysis of Main Girder for Xiaoxihu Partial Cable-Stayed Bridge;
小西湖部分斜拉桥施工过程模拟分析及主梁剪力滞效应分析
15.
Transfer Matrix Method for Shear Lag Analysis of Cable-stayed Bridge with Double Cable Plane and Wide-flange Beam
双索面槽型宽翼主梁斜拉桥剪力滞效应分析的传递矩阵法
16.
Shear Lag Effect Research of PC Cable-Stayed Bridge;
预应力混凝土斜拉桥剪力滞效应研究
17.
Study on Shear Lag Effect of Prestressed Concrete Spine Beam
预应力混凝土脊骨梁剪力滞效应研究
18.
Studies of Shear Lag in Short Leg Walls by Finite Element Method;
异形截面短肢剪力墙剪滞效应有限元分析