说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 泄洪道区
1.
Study on Corrosion and Protection of Oil Production Platform and Pipe in the Field of Spillway;
泄洪道区采油平台和管道的腐蚀与防护研究
2.
Aim at the characteristics that parts of oil wells of oil-field in Jiangsu locate the Hongze area floodway in the lake, which designed a kind of lake area oil extraction terrace.
针对江苏油田部分油井位于洪泽湖区泄洪道上的特点,设计了一种湖区采油平台。
3.
The spillway cannot be blocked, otherwise it will cause a serious problem.
不能堵塞泄洪道, 否则后果不堪设想。
4.
Restoration of damaged base-slab of spillway chute of Siping Hydroproject
寺坪水电枢纽溢洪道泄槽底板的修复
5.
The control section of spillway is the key section to curb the water flow.
溢洪道控制段是控制水流下泄的关键部位。
6.
The deposition of sediment in channels decreases the channel capacity and the flood-carrying capacity.
泥沙淤积在河道内,减少了河槽容量和泄洪能力。
7.
Visualization System Study on the Influence of Riverway Flood Because of Constructing Bridge;
拟建桥梁对河道泄洪影响的可视化系统研究
8.
Visualization Methods Study on Bridge Influence Estimation Towards Riverway Flood;
桥梁对河道泄洪影响评价的可视化方法研究
9.
The Stability Analysis of the Letting Out Trough Biteplate of Top Spillway of Local Material Dam;
当地材料坝坝顶溢洪道泄槽底板的稳定分析
10.
Characteristics Research of the Spillway Discharge on Overflow Concrete Face Rockfill Dam;
溢流式面板堆石坝坝体溢洪道泄流特性研究
11.
Application of Block-structured Grid in Numerical Simulation of Flood Hole
分区结构网格在泄洪深孔数值模拟中的应用
12.
Experiment and Numerical Simulation of Setting the Giude-flow-wall on the Curved Way of Discharge Trough of Spillway
溢洪道泄槽弯道段导流墙水力数值模拟与试验研究
13.
They were so squeezed together that they covered the pavement like the waves of a flooded torrent.
它们把道路挤得水泄不通,浩浩荡荡,宛如洪水的波涛。
14.
The Stability Analysis of the Chute Bottom Slab with Anchored Slab for the Top Spillway of Local Material Dam;
当地材料坝坝顶溢洪道带有地锚的泄槽底板的稳定分析
15.
Stability Analysis of Ogee Section at the End of Discharge Trough of Spillway of Earth-rock Dam on Deep Soft Foundation
深厚软基上土石坝坝体溢洪道泄槽末端反弧段的稳定分析
16.
A Study on Conditional Evolution of Discharging Atomization Slope Stability in Nuozhadu Hydropower Station;
糯扎渡水电站泄洪雾化区斜坡稳定条件演化研究
17.
Stability Analysis of the Malinyan Slope Lies in the Dam Erea of Xuanping Hydropower Station Considering Water-Fog Influnce;
考虑泄洪雾化条件下漩坪水电站坝区马铃岩滑坡稳定性分析
18.
Article41. Along floodways and in flood detention basins and flood storage basins, the utilization of land and the various construction projects must meet the requirements for the prevention of floods.
第四十一条在防洪河道和滞洪区、洪区内,土地利用和各项建设必须符合防洪的要求。