说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 池窑拉丝
1.
On July 29th,2002,the Fourth E glass Furnace of CTG was Ignited.
2002年7月29日,公司举行第四条无碱玻纤池窑拉丝生产线点火仪式。
2.
Coordination between Direct-Melt Glass Fiber Production Line Installation and Building Construction
玻璃纤维池窑拉丝生产线设备安装工程与建筑工程的配合
3.
wire drawing,drawbench and steel wire
拉丝、拉丝机、钢丝
4.
equalizing section
(窑池的) 温度调节区
5.
Successful Implementation of Hot Repair Technology for Furnace Regenerators
池窑蓄热室热修技术方案的成功实施
6.
The Study of Melt Flow in Glass Tanks with Bubbling Process and Its Application in E-glass Unit Melter;
玻璃池窑液流和鼓泡过程研究及在E玻璃单元窑中的应用
7.
Design of High Efficiency Low Energy Consumption Natural Gas Fired End Port Furnace for Multi-line Production
“—窑多线”高效率、低能耗大型烧天然气马蹄焰池窑设计
8.
Effect of Structure of Float Glass Furnace on Glass Quality and Energy Consumption
浮法玻璃熔窑窑池结构对玻璃质量和能耗的影响
9.
The children in the pool does not have a stitch on
池里的小孩子一丝不挂
10.
The children in the pool do not have a stitch on.
池里的小孩子一丝不挂。
11.
front engine battery charging fuse
前机电池充电保险丝
12.
non-slip cumulative type wire-drawing machine
无滑动蓄丝式拉丝机
13.
Principal requirements for flame plume length in end port glass-melting furnace were set forth.
提出了对马蹄焰池窑内最佳火焰长度的要求。
14.
Research on Modification Theory and Technics of Direct-Melting Glass Fiber Reinforced PA66;
池窑法玻纤填强PA66工艺原理及技术研究
15.
The Project Scheme of the WB Company s Pool Kiln Whose Annual Product is Ten Thousand Tons Poor Alkali Fiberglass;
WB公司万吨无碱玻璃纤维池窑项目方案
16.
RESIDUAL HEAT RECYCLE,DESULFURIZATION AND DUST-CATCHING OF THE SMOKE GENERATED FROM GLASS FIBER KILN
玻璃纤维池窑废气余热回收及脱硫除尘
17.
Discussion on Adaptive Maintenance for C-glass Fiber Furnaces in Late Campaign
中碱玻璃纤维池窑后期适应性养护措施探讨
18.
Design and Practice of 90 m~2 High Efficient Energy-saving Oil-fired Glass Tank Furnace
90m~2燃油高效节能玻璃池窑的设计与实践