1.
Review of the Research on Resources Reallocation of Enterprise s Failed Projects;
![点击朗读](/dictall/images/read.gif)
企业失败项目资源再配置研究:一个文献综述
2.
Study on Re-Collocation Problems of Human Resources in Failed ERP Project;
![点击朗读](/dictall/images/read.gif)
失败ERP项目人力资源再配置问题的研究
3.
This project is doomed to fail.
![点击朗读](/dictall/images/read.gif)
这个项目注意要失败。
4.
This counter shows the number of reservations that failed due to the lack of resources.
![点击朗读](/dictall/images/read.gif)
这个计数器显示由于缺乏资源而失败的保留项数量。
5.
Operation failed. An item with the same name already exists in the destination folder.
![点击朗读](/dictall/images/read.gif)
操作失败。目标文件夹中存在同名项目。
6.
A resource failed to pre-create. The resource will not be configured.
![点击朗读](/dictall/images/read.gif)
资源预创建失败。将不会配置资源。
7.
Test connection failed because of an error in creating data source object. %1
![点击朗读](/dictall/images/read.gif)
测试连接失败。因为创建数据资源目标时发生错误。%1
8.
the project failed through unmethodical planning.
![点击朗读](/dictall/images/read.gif)
这个项目失败于无条理的计划。
9.
Failed to upgrade the contact item for this folder.
![点击朗读](/dictall/images/read.gif)
为该文件夹升级联系人项目失败。
10.
Skip corrupted items and create a failure report.
![点击朗读](/dictall/images/read.gif)
跳过已损坏的项目并创建失败报告。
11.
Two thirds of outsourced projects fail, so there is a high likelihood of failure
![点击朗读](/dictall/images/read.gif)
三分之二的外包项目都会失败,因此在这里失败的可能性很大。
12.
Failed to allocate a object. Not enough resources.\0
![点击朗读](/dictall/images/read.gif)
分配对象失败。没有足够的资源。\0
13.
Failed to allocate a object. Not enough resources.
![点击朗读](/dictall/images/read.gif)
分配对象失败。没有足够的资源。
14.
The connection to the node failed. No resources will be collected.
![点击朗读](/dictall/images/read.gif)
连接到节点失败。没有收集资源。
15.
Incorrect file type. Resource import failed.
![点击朗读](/dictall/images/read.gif)
不正确文件类型。资源导入失败。
16.
Checkin failed because no resources were checked out from %0
![点击朗读](/dictall/images/read.gif)
签入失败,因为从 %0 中未签出任何资源
17.
Memory allocation failure. Free some resources and try again.
![点击朗读](/dictall/images/read.gif)
内存分配失败。请释放一些资源后重试。
18.
It is possible that the project investment would be delayed, terminated, failed or failed to reach the anticipated technical & economic target for the occurrence of risking incidentals.
有可能由于风险事件的发生而导致项目投资延期、中止、失败或达不到预期的技术经济指标。