说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 工程垫资
1.
"Direction" rather than" Blockage"-Brief Analysis of Proper Dealing with Advanced Payment Made by Construction Enterprises;
“堵”不如“疏”——浅析施工企业如何应对工程垫资现象
2.
The Research of the Solving Method on the Question of Contracting with Fund in Domestic Construction Field;
国内工程建设领域垫资承包问题解决方法研究
3.
On lawful cognition of contracting with funds in architectural engineering
对建设工程承包合同垫资承包的法律认识
4.
Application of sand and gravel cushion reinforced composites in the projects
加筋复合砂卵石垫层在工程中的应用
5.
Application of reno mattress and gabion in hydraulic engineering
雷诺护垫与格宾在水利工程中的应用
6.
Study on the Working of Penstock and Spiral Case with Elastic Layer;
垫层钢管和垫层钢蜗壳研究以拉西瓦水电站工程为例
7.
The application of three-dimensional earthwork mat planting grass in slope protection engineering
三维土工网垫植草在边坡防护工程中的应用
8.
The Project Characteristic of Geogrid and Application of Reinforced Cushion;
土工格栅的工程特性与加筋垫层应用研究
9.
On the Priority Security of the Wage Prepayment by Government in the Execution Proceedings
论法院执行中的政府垫付工资优先权实现
10.
Study and Test on Engineering Properties of Sand-gravel Cushion;
砂砾石碾压垫层的工程性能试验与研究
11.
Clogging test of liner cushion layer in Yellow-River-crossing tunnel liner of South-to-North Water Transfer Project
南水北调工程穿黄隧洞衬砌垫层淤堵试验
12.
On application of replacement cushion method in extension project of Jinbei Aluminum Industry
换填垫层法在晋北铝业扩建工程项目中的应用
13.
Application of Reynolds cushion in Sanjiazi levee engineering of harbin city
雷诺护垫在哈尔滨三家子堤防工程中的应用
14.
Summarization on the design of 6.3/0.4kV drainage transformer substation on plunge-pool at Ertan Hydropower Station
二滩水电站水垫塘6.3/0.4kV排水工程设计综述
15.
Research on Construction Technology of Geotextiles and Gravel Cushion for Reclamation Project in Zhoushan Diaoliang;
舟山钓梁围垦工程土工布及碎石垫层施工技术探讨
16.
The acquirement of accurate3 D measurements of the engine cylinder gasket is the key of quality control and reverse engineering.
发动机气缸垫精确三维尺寸的获得是气缸垫质量检验及其样品反向工程的关键。
17.
Construction Supervision and Quality Control of FS Slurry Blocking Pad in Lining Project in Zhupaichong River Way of Nanning
FS浆垫在南宁市竹排冲河道衬砌工程中的施工监理质量控制
18.
When the repayment fund has accumulated to a certain sum, the rate shall be reduced or suspended.
积欠工资垫偿基金,累积至规定金额后,应降低费率或暂停收缴。