说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 工业搬迁
1.
Analysis of the Movement of Industrial Firms Dominated by Local Governments:A Case of Beijing;
城市工业搬迁的动因、方式和效果——以北京市为例
2.
Environmental Impact Assessment for relocation of polluting industries in the urban area will be high-lighted to prevent the shift of the pollution toward the suburban area.
加强城市工业搬迁的环境影响评价,防止污染向郊区转移。
3.
Probe into the Relocation of University Library--Taking the Relocation of the Library of North China Institute of Aerospace Engineering as an Example
高校图书馆搬迁工作的探讨——以北华航天工业学院图书馆的搬迁为例
4.
That plant has been relocated.
那家工厂已经搬迁。
5.
With the moving and closure of enterprises the inner port of Duisburg came into industry wastelands.
杜伊斯堡内港因港口企业的搬迁和关闭,变成了工业废弃地。
6.
Study on Chemical Immobilization of Lead Contaminated Soil in a Former Relocation Enterprise Site
搬迁工业企业场地土壤铅污染的化学修复试验研究
7.
The carrying of burdens or goods as done by porters.
搬运,搬运业如由搬运工搬运重物及货物
8.
Create a moving day team to provide direction to movers
建立搬迁日工作组以向搬运工提供指导
9.
The Relocation Construction of Railway Dispatching and Directing Center without the Stop of Communication Dispatching
铁路调度指挥中心调度通信不中断业务搬迁施工
10.
Fourthly, it will pay more attention to upgrading the disposal of solid waste and controlling industrial pollution. It will begin to carry out a program to move industrial enterprises out of the city.
四是提高固体废弃物的处理水平,加强对工业企业的排污治理,实施工业企业搬迁计划;
11.
relocation allowances,expenses,(eg for those taking up a new job in a different area )
搬迁津贴、 搬迁费(如发给调往新地方工作之人员的).
12.
(British) someone who works for a moving company.
(英语)为搬迁公司工作的人。
13.
Study on the Conservation of the Relocation of Zhangfei Temple in Chong-qing City;
重庆市张飞庙搬迁工程保护问题研究
14.
Migration and aid-the-poor work for Dalong Reservoir;
大隆水库移民搬迁与扶贫工作相结合
15.
Comparative Analysis of Relocation Policy of Polluting Enterprises in China
中国城市污染企业搬迁政策比较分析
16.
Maximum acceptable weight of lift for manual lifting tasks;
手工搬举作业的最大可接受搬举重量
17.
Review and thinking on the migration-relocation work in the construction preparation stage;
施工准备期移民搬迁工作的回顾与思考
18.
Construction Plan and Difficult Point Countermeasure of Large-scale Spherical Tanks Relocation Project
大型球罐搬迁工程施工方案及难点的应对