说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 战后移民计划
1.
On the Reasons and Characteristics of the Immigration Program in Australia after the Second World war;
论澳大利亚战后移民计划的原因和特点
2.
immigration-linked investment scheme
与移民有关的投资计划
3.
The“ pioneer Project” was an immigration plan that was a necessary due to the eminent destruction of mother planet.
先驱者计划”…是一项在母星已无可避免的走向衰亡之后,不得已而实行的移民计划。
4.
Code on Immigration-Linked Investment Schemes
《与移民有关的投资计划守则》
5.
Reservoir area inhabitant resettlement planning design for Changzhou hydraulic complex;
长洲水利枢纽库区移民安置规划设计
6.
The Change in Immigration Policy in Canada and the United States after World War Ⅱ;
二战后加拿大和美国移民政策的转变
7.
Some are concerned simply with planning the logistics of future wars;
有的一心制订未来战争的后勤计划;
8.
America s Policy towards the Monnet-Schumann Plan in the Postwar Period;
论战后美国对“莫内—舒曼计划”的政策
9.
South Asian Immigrants and Their Progeny in Britain after World War Ⅱ in Cultural Prospective;
文化视角中的二战后英国南亚裔移民及其后代
10.
With the passing of time, the benefits of family planning, for the people and for posterity, are bound to be more apparent.
随着时间的推移,计划生育造福于民、惠及子孙后代的功效,必将进一步显现出来。
11.
The Evaluations of National phase 26 Years Warfare Plan;
对国民党政府《民国二十六年度作战计划》的评价
12.
Canada plans to admit225,000 immigrants in2005, including60 percent skilled workers and their families and40 percent family unification and refugee immigrants.
加拿大计划在2005年吸收22500移民,其中有60%是技术移民及其家庭。
13.
Improving Resident Resettlement Planning and Design of Hydroelectric Project to Cope with New Policies and Regulations for Resident Resettlement;
改进移民安置规划设计 适应新的移民法规政策环境
14.
The funds needed for the resettlement of the relocatees shall be included in the investment plan of the project, and the resettlement work shall be completed within the construction stage according to schedule.
安置移民所需的经费列入工程建设投资计划,并应当在建设阶段按计划完成移民安置工作。
15.
people in the would-be flooded area began to migrate to other places.
第一批计划淹没地区的移民已经开始迁往外地。
16.
Revision and Improvement of Design Standard for Resettlement Planning of Hydroelectric Projects;
水电工程移民安置规划设计标准的修编改进
17.
Review resettlement planning design for the reservoir area(Guangxi part) of Baise Multipurpose Dam Project;
百色水利枢纽(广西库区)水库移民规划设计
18.
Design and realization of information system for large reservoir resettlement plan and management;
大型水库移民规划管理信息系统的设计与实现