说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 亭子口水电站
1.
Research on the Static & Dynamic Analysis of Stress-deformation and Anti-sliding Stability of the Upper Lock Head of Tingzikou Hydropower Station
亭子口水电站上闸首应力变形与抗滑稳定静动力分析研究
2.
Technology and Measures on Mixed Sand Processing of Tingzikou Water Control Project
亭子口水利枢纽混合砂加工工艺措施
3.
Study on stability of the tunnel-face slope at Houziyan Hydropower Station
猴子岩水电站进水口洞脸边坡稳定性分析
4.
Automatic Measurement and Prediction System of Water Regime in Construction Period of Tingzikou Water Control Project
亭子口水利枢纽施工期水情自动测报系统
5.
Selection and Major Technology Study of Turbine of Tingzikou Water Control Project
亭子口水利枢纽水轮机的选择及主要技术研究
6.
Ideas on Soil and Water Conservation Plan of Tingzikou Water Control Project
亭子口水利枢纽水土保持方案编制思路
7.
Test Analysis on Blasting Vibration in Dam Foundation Excavation of Wanjiakouzi Hydropower Station
万家口子水电站坝基开挖爆破振动试验分析
8.
Using Characteristic Water Level for Gradation Study on Bank Slump in Tingzikou Reservoir Area
利用特征水位对亭子口库区塌岸进行分段研究
9.
Temperature Control of Longitudinal Cofferdam RCC in Tingzikou Water Control Project
亭子口水利枢纽纵向围堰碾压混凝土温度控制
10.
Construction Design on Second-phase Cofferdam and River Closure of Tingzikou Water Control Project
亭子口水利枢纽二期围堰与大江截流施工设计
11.
Introduction to the Resettlement Planning of Tingzikou Water Control Project
亭子口水利枢纽移民安置规划工作简述
12.
Management on Initial Design of Tingzikou Water Control Project
亭子口水利枢纽前期设计工作管理综述
13.
Study on the Hydraulic Characteristics of Multi-Level Intake Structure of Hydropower Station;
水电站进水口分层取水水力特性研究
14.
The Stability Research of Jiuzi Collapse Accumulation Wanjiakouzi Hydropower Station in Yunnan Province
云南万家口子水电站九子崩滑堆积体稳定性研究
15.
Working out the pattern of reservoir operation and calculating the benefit of flood control for Tingzikou hydroproject Huang jia-wen Luo bin;
亭子口水利枢纽防洪调度方式拟定及防洪效益计算
16.
Design and Construction of Cofferdam for Diversion Channel at Tingzikou Water Conservancy and Hydropower Project
亭子口水利枢纽工程导流明渠围堰的设计与施工
17.
Review on Comprehensive Treatment of Dayuanbao Landslide in Tingzikou Water Control Project
亭子口水利枢纽工程大园包崩滑体综合治理施工综述
18.
Plan of Concrete Aggregate Material Sources and Processing Factory Settings for Tingzikou Water Control Project
亭子口水利枢纽混凝土骨料料源规划与施工工厂的设置