说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 铜湾水电站
1.
Stability Analysis and Estimation for Left Bank Slope of Tongwan Hydropower Station
铜湾水电站左岸高边坡稳定性分析与评价
2.
Brief introduction to the power market and power transmission scheme for Xiaowan Hydropower Station;
小湾水电站电力市场和输电方案概述
3.
Chai Wan (S.W.) Pumping Station
柴湾(海水)抽水站
4.
Analysis of cracks on cement poles of Taipingwan hydropower station and its reinforcement
太平湾电站变电站水泥杆裂缝分析及加固
5.
Summary on the Excavation of Tailrace Surge Chamber in Generating System of Xiaowan Hydropower Station
小湾水电站引水发电系统尾水调压室开挖综述
6.
The Optimization Study of Construction Diversion Buildings in Xiaowan Power Station;
小湾水电站施工导流建筑物优化研究
7.
Experiment and application of cement-based grout material in Tianwan NPP
田湾核电站水泥基灌浆料试验与应用
8.
Study on the Properties of Concrete for Arch Dam of Xiaowan Hydropower Station
小湾水电站双曲拱坝混凝土性能研究
9.
Influence of Pushihe flood to tail water level of taipingwan hydropower station
蒲石河洪水对太平湾水电站尾水位的影响
10.
A summary of land acquisition and resettlement for the construction of Xiaowan Hydropower Station;
小湾水电站工程水库建设征地移民工作综述
11.
Quality Control of Anti-scouring and Anti-abrasion Concrete for the Water Cushion Pool of Xiaowan Hydropower Station
小湾水电站水垫塘抗冲耐磨混凝土质量控制
12.
Influence of flood from Pushi river on flood discharge of Taipingwan hydropower station
蒲石河洪水对太平湾水电站泄洪的影响
13.
Discussion on Construction Technology of Abrasion-resistant Concrete for Water Cushion Pond of Xiaowan Hydropower Station
小湾水电站水垫塘抗冲耐磨混凝土施工技术
14.
SUPERHIGH VOLTAGE POWER TRANSMISSION PROJECT OF THE HYDROPOWBR STATION GROUP IN JAMES GULF
詹姆斯湾水电站群的超高压直流输电工程
15.
Feasibility Analysis of Air-Cooling Hydro-Generator at Xiaowan Power Station;
小湾电站水轮发电机全空冷可行性分析
16.
GNPS 18-Months Fuel Cycles Core Thermal Hydraulic Design
大亚湾核电站18个月换料堆芯热工水力设计
17.
River Closure Model Test and Study for Construction of Xiaowan Hydropower Project on the Lancang River
澜沧江小湾水电站施工截流模型试验研究
18.
Surrounding Rock Stability Analysis of Xiaowan Hydropower Project Underground Powerhouse Chambers
小湾水电站地下厂房洞室群围岩稳定分析