1.
Excavation Engineering Charts and Management of Mineral Resources;
![点击朗读](/dictall/images/read.gif)
采掘工程图件与矿产资源管理的关系
2.
Design on Fully Service Period Dynamic Management System of Mining and Excavation Engineering Drawing and Document
采掘工程图件全寿命周期动态管理系统设计
3.
(6) having an actually measured surface and underground engineering comparison drawing, a mining and excavation plan and a ventilation system drawing;
(六)有实测的井上、井下工程对照图、采掘工程平面图、通风系统图;
4.
The Dynamic Managed CAD System Model of the Plan on the Colliery Excavate Engineering
![点击朗读](/dictall/images/read.gif)
煤矿采掘工程平面图动态管理CAD系统模型构造
5.
Study on the Dynamic Management System of Excavation Engineering Plans in Colliery
![点击朗读](/dictall/images/read.gif)
煤矿采掘工程平面图动态管理CAD系统研究
6.
synthetic plan of striping and mining
![点击朗读](/dictall/images/read.gif)
采剥工程综合平面图
7.
Grub Project Superseding Intelligent Illation and Graphical Presentation Study;
![点击朗读](/dictall/images/read.gif)
掘进工程接替智能推理与图形化研究
8.
The Application of Text Mining to Engineering Drawing;
![点击朗读](/dictall/images/read.gif)
文本数据挖掘在工程图文档中的应用
9.
Research and Application on Data Mining of Association Rules in Process Industry;
![点击朗读](/dictall/images/read.gif)
过程工业中关联规则采掘的研究与应用
10.
Theoretical and Application Study on the Dynamic Visual Mining and Excavating Management System of Coal Mine
煤矿采掘工程动态可视化管理理论与应用研究
11.
The Application Status of System Engineering in Mining Plan Optimization
![点击朗读](/dictall/images/read.gif)
系统工程在采掘计划优化中的应用现状
12.
Control the discussion of the fabrication cost of the project by working drawing budget
![点击朗读](/dictall/images/read.gif)
采用施工图预算控制工程造价的探讨
13.
ploration costs in extractive industries
![点击朗读](/dictall/images/read.gif)
采掘工业中的勘探成本
14.
a tool or machine used for digging or excavating.
![点击朗读](/dictall/images/read.gif)
用于挖掘或采掘的工具或机器.
15.
Adds a purchasing symbol to your workflow flowchart.
![点击朗读](/dictall/images/read.gif)
将采购符号添加到您的工作流程图中。
16.
The Study of Controlling Engineering Cost Through the Construction Drawing Budget and Engineering Volume List Valuation;
采用施工图预算和工程量清单计价控制工程造价的研究
17.
The miners worked at the face for 5hours.
![点击朗读](/dictall/images/read.gif)
矿工在采掘面上工作了5小时。
18.
The miners worked at the face eight hours a day.
![点击朗读](/dictall/images/read.gif)
矿工们在采掘面上每天工作八小时。