说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 大坝表孔泄流
1.
Research on Numerical Modeling of Smoothed Particle Hydrodynamics and Simulate Discharge Through Crest Orifice on Dam;
光滑粒子数学模型的研究及对大坝表孔泄流的模拟
2.
Shape Study on Large-discharge Flood-releasing Energy Dissipator for Crest Spillway of Medium and Small-sized Arch Dam
中小型拱坝表孔大流量泄洪消能建筑物体形研究
3.
A Study on Stress Influence of the Large Orifice on the Masonry Arch Dam;
大尺寸泄洪孔对浆砌石拱坝坝体应力影响研究
4.
Experiment Research and Numerical Simulation on Flow Field of Discharge from Surface-Bottom Outlet on Low Waterhead and Big Flux;
低水头大流量厂坝联合泄洪消能流场的研究
5.
Experimental Study on Energy Dissipation of Flood Discharge for Upper Hole of Double-curvature Arch Dam of Donghe Reservoir
洞河水库双曲拱坝表孔泄洪消能问题的试验研究
6.
Numerical Simulation and Experiment Study on Flood Discharge and Energy Dissipation of High Dam with Large Discharge
高坝大流量泄洪消能数值模拟及实验研究
7.
Three-Dimensional Numerical Simulation on Flood Field of Riverbed Hydropower Station
河床式电站大坝泄洪流场的三维数值模拟
8.
Surface Cracks Problem of Spillway Dam in Fengman Projects;
丰满大坝溢流坝段表面裂缝问题研究
9.
Analysis on Forced Behavior of High Arch Dam s Outlet Bearing Structure;
高拱坝泄洪孔支承结构工作性态分析
10.
On River Bed Scour Resistance Downstream of High Spillway Dam in Canyon Region with Big Flood Discharge
试论峡谷区大泄量高溢流坝下游河床的抗冲能力
11.
Effect to Risk Rate of Dam′s Flood Carrying Capacity Under Dynamic Controlling the Normal Water Level in Flood Season
动态控制汛限水位对大坝泄流能力风险率的影响
12.
Characteristics Research of the Spillway Discharge on Overflow Concrete Face Rockfill Dam;
溢流式面板堆石坝坝体溢洪道泄流特性研究
13.
Research on Analysis of the Bottom Outlet in High-Head Thin Arch Dam by Finite Element Method;
高水头薄拱坝泄水底孔有限元计算分析研究
14.
Application of Double-pump Large Flow Vibrating Boring and High-pressure Jet Grouting Cut-off Wall in Fine Silt Dam
双泵大流量振孔高压旋喷防渗墙在粉细砂坝中的应用
15.
The coupled system dynamical characteristic anlysis of chut-flow-dam body of overfall concrete face rockfill dam
溢流混凝土面板堆石坝的泄槽—水流—坝体耦合系统动力特性分析
16.
Analysis on damage reason of basin plate of stilling pool and reinforcement at Ankang dam
安康大坝表孔消力池底板破坏原因分析及补强加固处理
17.
Design and Construction of 25 m Span Slipform for Surface Discharge Hole of Lower Reservoir of Zhanghewan Pumped Storage Power Station
张河湾蓄能电站下水库大坝表孔25 m跨度拉模设计与施工
18.
To excrete perspiration through the pores of the skin.
出汗,流汗通过皮肤上的毛孔排泄汗液