说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 防治工程设计
1.
Preliminary Analysis on Design of Debris Flow Prevention works
泥石流防治工程设计的若干问题初探
2.
Study on Movement Mechanism and Engineering Design Parameters of Gully-shaped Debris Flows along the Tianshan Highway;
天山公路沟谷泥石流运动机理和防治工程设计参数研究
3.
Study on Problems of Designing and Frozen Disaster Prevention & Curing on Seepage Control in Canal Engineering;
渠道防渗工程设计及冻害防治问题研究
4.
Design of the Measures for the Prevention of Water Loss and Soil Erosion of the First-stage Construction of Shuozhou’s Huairen Power Plant
朔州怀仁电厂一期工程水土流失防治措施设计
5.
Code for design of fire prevention of railway engineering
铁路工程设计防火规范
6.
Typical Design of Engineering Measure for Soil and Water Conservation in Ruiguang Heat-engine Plant,Shanxi
山西瑞光电厂建设中防治水土流失工程措施的典型设计
7.
Research on Technical Scheme Selection and Construction Organization Design for the Sand Prevention and Control Projects in Chidabai Railway
赤大白铁路防沙治沙工程的技术方案选择与施工组织设计研究
8.
Design specification of CBR defence for civil air defence works
人民防空工程防化设计规范
9.
Code for fire protection design of civil air defence works
人民防空工程设计防火规范
10.
Design code of civil air defence works with dual utilization of peacetime and wartime
平战结合人民防空工程设计规程
11.
Curtain wall project rainproof water percolation design and construction measure
幕墙工程防雨水渗漏设计及施工措施
12.
Article 14 Facilities for prevention and control of environmental noise pollution must be designed, built and put into use simultaneously with the main part of a construction project.
第十四条 建设项目的环境噪声污染防治设施必须与主体工程同时设计、同时施工、同时投产使用。
13.
Article 26. Installations for the prevention and control of pollution at a construction project must be designed, built and commissioned together with the principal part of the project.
第二十六条 建设项目中防治污染的设旋,必须与主体工程同时设计、同时施工、同时投产使用。
14.
The facilities for prevention and control of water pollution must be designed, constructed and put to use or into operation simultaneously with the main part of a construction project.
建设项目中防治水污染的设施,必须与主体工程同时设计,同时施工,同时投产使用。
15.
Installations for the prevention and control of pollution at a construction project must be designed, built and commissioned together with the principal part of the project.
建设项目中防治污染的设旋,必须与主体工程同时设计、同时施工、同时投产使用。
16.
The Soil Erosion is Prevented and Cured in the Construction Project of Water Conservancy
水利工程建设项目中的水土流失防治
17.
Civil air defence works lighting design standard
人民防空工程照明设计标准
18.
Standards of medical aid engineering design of the civil air defence
人民防空医疗救护工程设计标准