说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 采场矿压
1.
Study on Optimization of the Support of Rock Pressure in the Thick Seam Coal Face and Gas Tail Roadway in Shaqu Mine;
沙曲矿大采高采场矿压和瓦斯尾巷的支护优化研究
2.
Study for Mining Pressure of Super Long Coal Face in Three Soft Rock Layers;
三软煤层超长工作面采场矿压显现规律研究
3.
Characteristics of strata behaviors of the long-wall full-mechanized caving mining field on strike of steeply thick coal seam
大倾角特厚煤层走向长壁综放采场矿压特征
4.
Disposal method for wall compression in waste lifting stoping
削壁充填采矿法采场内压帮的处理方法
5.
Study on the Regularity of No -pillar Ground Pressure Occurrence of Tonghua Jien Nickel Mine
通化吉恩镍矿无底柱采场地压显现规律研究
6.
Research on Change Law and control Techniques of the Stope Ground Pressure in Chengchao Iron Mine
程潮铁矿采场地压变化规律与控制技术研究
7.
The Study of the Overburden Breakage Character and Phenomona of Ground Preaaure in the Great Mining Height of the "Islated Island" Stope;
大采高孤岛采场覆岩运动破坏特征和矿压显现研究
8.
Mining Height Long Caving Mining Stope Pressure Control Technology
大采高超长综放工作面采场矿山压力控制技术研究
9.
Pressure control in sub-level long face surrounded by three sides mined areas of C-shaped strata spatial structure
三面采空综放采场“C”型覆岩空间结构及其矿压控制
10.
Study of the Overlying Strata "O" Letter Type Spatial Structures of Longwall and Correlate Rock Pressure;
长壁采场覆岩“O”型空间结构及相关矿山压力研究
11.
Study on Multi-field Coupling Theory and Its Application of Hydraulic Fracturing and Solution Mining for Salt Deposits;
盐类矿床水压致裂水溶开采的多场耦合理论及应用研究
12.
Movement Evolution of Failured Overburden Infullenced Obiviously to the Ground Pressure Around Working;
对采场矿山压力有明显影响的覆岩破坏运动演化规律
13.
Study on Distributing Rules of Ground Pressure and Control Countermeasure in the Stope of YuHuaSi Mine;
武钢余化寺铁矿采场地压规律分析及控制对策研究
14.
Study on Rock Pressure of Donghai Coal Mine Deep Coal-seam Working Face
东海矿深部回采工作面矿压规律研究
15.
Numerical simulation analysis of underground pressure in fully mechanized top-coal caving face of Tingnan coal mine
亭南煤矿综放开采矿山压力数值模拟
16.
Study on Rock Pressure Law of Fully Mechanized Mining Coal Face with Mining Heitht of 5.8~6.0m in Sihe Coal Mine;
寺河煤矿5.8~6.0m大采高综采面矿压规律研究
17.
Code for design of district station and chambers of coal mine
煤矿矿井采区车场和硐室设计规范
18.
Haul Road Construction and Maintainance in Dexing Copper Mine Pit
德兴铜矿采矿场山顶公路施工与养护