说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 条带上行开采
1.
Study of Deformation and Destruction Mechanics and Numerical Simulation on Ascending Strip Mining of Short Distance Coal Seams;
近距离煤层条带上行开采煤岩层变形破坏机理及数值模拟研究
2.
Behavior Law of Mine Pressure in Roadways Under Conditions of Mining With Coal Pillars
带煤柱开采条件下巷道矿压显现规律
3.
Analysis on geological condition of coal seam mining with presser in ZhangCun Mine
章村矿下组煤带压开采地质条件分析
4.
~(3D)Numerical Simulation Research on the Confirmation of Rational Mining and Pillar Width in Strip Mining
条带开采合理采留宽确定的FLAC~(3D)数值模拟研究
5.
Research on Strip Mining under Buildings of Donghuantuo Coal Mine South 1st District;
东欢坨矿南一采区建筑物压煤条带开采研究
6.
Numerical Study on Substitution Extraction in Coal Pillar of Strip Mining
条带开采留设煤柱置换开采方法的数值模拟研究
7.
overhand cut and fill
上行分层采掘充填开采法
8.
Study on the Theory and Its Application of Upward Mining of Left-Over Coal
残采区上行开采基础理论及应用研究
9.
Feasibility on the upward mining of the left-over coal above goaf with pillar supporting method
刀柱采空区上方遗弃煤层上行开采可行性判定
10.
Research on the Rule of Surface Movement and Deformation Caused by Strip Mining in Steep Seam;
急倾斜煤层条带开采地表移动与变形规律研究
11.
Numerical Simulation of the Strip Mining under Shen-Da Super-way;
沈大高速公路下压煤条带开采的数值模拟
12.
Research on Parameter of Trip Mining under the Thickness Collapsible Loss;
巨厚湿陷性黄土覆盖层下条带开采参数研究
13.
Fundamental Research on Localization Hazard Monitoring Due to Three-underground Trip Mining
“三下”条带开采局部化灾害监测基础研究
14.
Study on Pillars Stability by Keeping Water in Strip Mining for Small and Medium-sized Mines in Northern Shanxi Province
陕北中小矿井条带保水开采煤柱稳定性研究
15.
Evaluation method for pillar stability during strip mining in multiple coal seams
多煤层条带开采煤柱稳定性评价方法研究
16.
Evaluation on 3~# coal mining with water pressure condition in Guhan coal mine
古韩联营煤矿3~#煤层带水压开采条件评价
17.
Surface Movement Laws of Deep Wide Strip-Pillar Mining Under Thick Alluvium
巨厚松散层下深部宽条带开采地表移动规律
18.
Study on the Surface Movement Law in Strip Mining of Inclined Multiple Coal Seams
倾斜多煤层条带开采地表移动规律研究