说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 秦山二期
1.
The Reliability Analyses about Lose of 48V DC Voltge of Qinshan Second Power Plant;
秦山二期LCA48V直流失电的可靠性分析
2.
The Discussion of Applying RCM in Qinshan PhaseⅡ;
RCM分析在秦山二期的应用研究探讨
3.
Reactor Containment Decompression and Filtration in Qinshan NPP Phase Ⅱ;
秦山二期安全壳超压后的过滤及卸压
4.
CFD Analysis on Hydrogen Risk in Qinshan II NPP
秦山二期核电站氢气风险的CFD研究
5.
Qinshan Phase Ⅱ Nuclear Power Plant Main Steam Isolation Valve Vibration and Noise Analysis;
秦山二期核电站主蒸汽隔离阀振动与噪音分析
6.
Qinshan Ⅱ Nuclear Power Plant Automatic Reload Design System;
秦山二期核电站换料设计文件自动生成系统
7.
Development and localization of fans used in the examination system of atmosphere in nuclear island(ETY)for Qinshan NPP PhaseⅡextension project
秦山二期扩建工程ETY风机的研制与国产化
8.
Improvement on Restart Relay Connection of Qinshan Phase Ⅱ 500kV Circuit Breaker
秦山二期500kV断路器重动继电器接线的改进
9.
Research on Hydrogen Removal Mitigation Measures during Severe Accident of Qinshan Phase Two Extensional Project;
秦山二期扩建工程严重事故下安全壳内消氢措施的研究
10.
Safety Analysis about the Accident of Completely Losing Feedwater in Qinshan Second Power Plant;
秦山二期蒸汽发生器完全丧失给水事故的安全分析
11.
The Safty Analyses about Boron Dilution Event in Maintenance Cold Shutdown State of Qinshan Second Power Plant;
秦山二期维修冷停堆下硼误稀释事件的安全分析
12.
Design of Neutron Source Assembly for Qinshan Phase II NPP Project
秦山核电二期工程反应堆中子源设计
13.
The Research of Process Control for NPQJVC Phase II Extension Project;
秦山核电二期扩建工程进度控制研究
14.
Design of CRDM for Qinshan Phase II NPP Project
秦山核电二期工程反应堆控制棒驱动机构设计
15.
Design of Reactor Pressure Vessel for Qinshan Phase II NPP Project
秦山核电二期工程反应堆压力容器设计
16.
Qinshan-II Extension Project Severe Accident Countermeasure Analysis;
秦山核电二期扩建工程严重事故对策分析
17.
Research on Equipment Procurement and Supervision for Qinshan Nuclear Power Plant Phase Ⅱ;
秦山核电二期工程设备采购与监造管理研究
18.
Design of Pneumatic Quick Isolation Damper in No.2 Project of Qinshan Nuclear Engineering;
秦山核电二期工程气动快速隔离阀的设计