说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 掘进机隧道
1.
Structure Analysis on Rock Tunnel Boring Machine Pipe Liner;
岩石掘进机隧道管片衬砌的结构分析
2.
pattern recognition of full face TBM boring performance
全断面隧道掘进机掘进状况分类识别研究
3.
Study on Pattern Recognization of Tbm Boring Performance of Qinling Tunnel;
秦岭隧道全断面掘进机掘进状况识别分析研究
4.
Operation principle analysis of disc cutter on TBM
隧道掘进机盘形滚刀的工作原理分析
5.
Alteration of Control System for Power of TB880E-type TBM
TB880E型隧道掘进机控制系统电源改造
6.
Improvement of Motor Waterproof of Dust-exhaust System of TB880E-type TBM
TB880E型隧道掘进机除尘系统电机防水的改进
7.
Set up the TBM Industries for Promoting the Underground Space Development in China
建立隧道掘进机产业 促进我国地下空间开发
8.
coal or rock cutter and tunneling machinery ,self-propelled
截煤或截石机和隧道挖掘机械,自动推进
9.
coal or rock cutter and tunneling machinery ,not self-propelled
截煤或截石机和隧道挖掘机械,非自动推进式
10.
Theoretical Analysis of Special Section Tunnel Cutting Mechanism of Shield Machine;
盾构掘进机异形断面隧道切削机构的理论研究
11.
Mechanical Analysis for Main Frame of Railway Soft Rock Tunnel Roadheader;
铁路软岩隧道臂式掘进机主机架力学特性分析
12.
Design of Control System for Auger-bore Microtunnelling Machine;
螺旋式微型隧道掘进机控制系统的设计
13.
Briefly talking of industrialization and development ways of tunnel boring machine;
浅议我国隧道掘进机产业化及发展方向
14.
Study of Cutter Layout Design of Full-face Rock Tunnel Boring Machine
全断面岩石隧道掘进机刀盘刀具布置方法研究
15.
Study on Mechanical Behavior of Metro Tunnel Construction by Tunnelling Machine in Weak-Broken Surrounding Rock
软弱破碎围岩地铁隧道掘进机施工力学研究
16.
Study on the Simultaneous Lining Technology in the Long Tunnel Bored by Main Beam TBM
长大隧道敞开式掘进机施工中的同步衬砌研究
17.
Based on applicability of each type of TBM, users can select appropriate TBMs to meet their needs and geological conditions.
使用者可根据地质条件及特殊需要对隧道掘进机进行初步的选型。
18.
A Model Experiment Study on Optimal Characters of Blocks on Self-drive Tunnel Excavating Machine;
新型自行走式隧道掘进机增阻结构合理形式模型试验研究