说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 高塔施工
1.
A special installment technology of the construction tower crane attached to the minaret of the great mosque
大清真寺高塔施工塔机的特殊附着技术
2.
Safety Management for the Ultra-high Structure Construction of Guangzhou TV Tower
广州电视塔超高层结构施工安全管理
3.
Lifting Construction Techniques for Big Tonnage Saddle in High Tower Suspension Bridge
高塔悬索桥大吨位鞍体吊装施工技术
4.
Design and construction of Sutong Bridge tower
苏通大桥300米高塔的设计与施工
5.
Construction Technology for Tower Crane Dismantlement in Steel Structure Work of Super Tall Building
超高层建筑钢结构工程塔吊拆除施工技术
6.
Application of Swing Arm Tower Crane Erection Technology in 1000 kV UHV Double Circuit Steel Pipe Tower Construction
摇臂抱杆组塔技术在1000kV特高压双回路钢管塔施工中的应用
7.
New Integral-Lift-Base Construction Method for Tall Antenna Mast
高耸塔桅天线基座整体提升简易施工法
8.
Key Technology for 500 kV Meizhou Bay Large Crossing Over-sea Tower Erection
500kV湄洲湾海上跨越高塔组立施工关键技术
9.
Construction Technology for Super Tall and Heterotypic Core Tube of Guangzhou New TV Tower
广州新电视塔超高异型核芯筒施工技术
10.
Optimal Design for Wall Attachment with 132HC Tower Crane in Construction of Super High-Rise Building
超高层建筑施工中的132HC塔机附墙形式设计优化
11.
Construction Technology of Super-high Special Shaped Core Tube of Guangzhou New TV Tower
广州新电视塔超高异形核心筒施工技术
12.
Fault Analysis of High Voltage Transmission Tower Collapse During Rebuilt
高压塔换塔移线过程中倒塔事故分析及措施
13.
Analysis on the Integrally Hoisted Construction of Large-scale Oil Refinery Coke Drum
大型炼油厂焦炭塔高空整体吊装施工技术分析探讨
14.
Design Methods and Construction Technologies of High-rise with Multiple Towers,High Position Cantilever and Linked Structure
当代MOMA工程高层多塔楼、高位悬挑及连体结构设计与施工关键技术研究
15.
Code for construction and acceptance of chemical tower-type equipment
化工塔类设备施工及验收规范
16.
Construction Technology for Large Inclined Column Footing of Guangzhou New TV Tower
广州新电视塔大型倾斜柱脚施工工艺
17.
On Construction Technique of Intake Tower of Water Supply and Power Tunnel in Hengquan Reservoir
横泉水库供水发电洞进水塔施工工艺
18.
Probe into the Technology to Construct Iron Tower for 750kV Pingqian Double Transmission Line
750kV平乾线双回路铁塔施工工艺的探讨