说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 东线水源工程
1.
Model of Water-supplying Rate of Water Resources Project in Eastern Route Project for South-to-North Water Diversion;
南水北调东线水源工程供水水价模型研究
2.
Study on Source Pump Station Optimal Operation of the First-stage Project of Eastern Route of South-to-North Water Transfer;
南水北调东线一期工程源头泵站优化运行研究
3.
On the Research of Water Resource Optimization Distribution of Shandong Province and the East-line South-to-North Water Transfer Project;
山东省水资源优化配置与南水北调东线工程研究
4.
Water Source Diversion Management in the Middle Route of the South-to-North Water Transfer Project
南水北调中线水源工程调水管理研究
5.
Surface Source Pollution Control in the Dongjiang--Shenzhen Water Supply Scheme
东深供水工程面污染源管理工作制度
6.
Study on Water Resources in the Third Project of Chen Ming Thermoelectricity Factory of Shandong;
山东晨鸣热电厂三期工程水资源研究
7.
Water Resources Argumentation of Tapping Potential of the Project of Diversion from Yellow River to Qingdao in Shandong Province;
山东省引黄济青工程挖潜水资源论证
8.
Study on the Scale of Water Supply to Shandong Province by South-to-North Water Diversion and the Water Price;
南水北调东线工程山东供水区的调水规模及供水水价分析
9.
Research on Municipal Sewerage Harness of Shandong Segment in East Route of South-to-North Water Diversion Project;
南水北调东线工程山东段城市污水治理工程规划研究
10.
Research on Risk and Response for Project in Shandong Section of Eastern Route Project of South-to-North Water Diversion;
南水北调东线山东段工程风险及其应对研究
11.
Study on Soil Erosion in Source Area of Middle Line Project of Transferring Water from the South to the North;
对南水北调中线工程水源区水土流失的思考
12.
Study on the Problem of Timely Water Supply to the Yellow River Through the East Line Project Diverting Water from South to North;
南水北调东线工程相机向黄河补水研究
13.
Modeling and Simulation about Water Price System of the East Route of South to North Water-Transfer Project;
南水北调东线工程水价系统建模及仿真
14.
Water Supply Cost Sharing and Calculating of the First Stage Project of the Eastern Route of the South-to-North Water Transfer;
南水北调东线第一期工程供水成本分摊与核算
15.
Effect of South-to-North Water Transfer East Line Project on Water Environment of Jiangsu Province and Defending Strategies;
南水北调东线工程江苏段水环境问题及其对策
16.
Analysis of Engineering Benefit of Hongze Lake Raising Water Level of Sluice;
南水北调东线洪泽湖抬高蓄水位工程效益分析
17.
Some considerations about "water bank" of east route of South-to-North Water Transfer project based on option theory;
期权理论与南水北调东线工程“水银行”设想
18.
Establishment of water price system emulating model for east line of south to north water transfer project;
南水北调东线工程水价系统仿真模型的建立