说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 李家峡高拱坝
1.
Research on Models and Indexes of Safety Monitoring of Lijiaxia High Arch Dam;
李家峡高拱坝安全监控模型与监控指标研究
2.
The convolute analysis of Lijiaxia arch dam material parameter based on BP neural network
基于bp神经网络的李家峡拱坝材料参数反演
3.
Analysis of Static, Dynamic Calculation of Lijiaxia Arch Dam;
李家峡水电站拱坝静、动力计算分析研究
4.
Analysis on Level Displacement Changes and Study on Safety Monitoring Model of Lijiaxia Arch Dam
李家峡拱坝水平位移监测资料模型分析
5.
Analysis on Engineering Geological Conditions of the Arch Dam in Lijiahe Reservoir of Xi'an City
西安市李家河水库拱坝工程地质条件分析研究
6.
Study on Excavation Disturbed Zone and Ogee Excavation Scheme of High-stress Dam Foundation at Deep Valley
高地应力峡谷高拱坝坝基开挖扰动效应与反弧开挖形式优化研究
7.
Study of Control Effect of Rockmass Structure on Dam Abutment Rockmass Deformation and Failure of High Arch Dam of Tiger Leaping Gorge Hydroelectric;
虎跳峡水电站高拱坝坝肩岩体变形破坏的岩体结构控制效应研究
8.
MONITORING RESULT ANALYSIS OF ROCKMASS STABILITY AT THE LEFT ABUTMENT FOR LIJIAXIA HYDROPOWER STATION
李家峡水电站左坝肩岩体稳定监测成果分析
9.
Blasting Vibration Measurement for Dam Abutment of Lijiaxia Hydropower Station
李家峡水站工程坝肩开挖的爆破震动测量
10.
The Cause Mechanism and Stability Analysis of Landslide Ahead Lijiaxia Dam;
李家峡坝前滑坡成因机理及稳定性分析
11.
Numerical Modeling Study on the Deformation Stability of Engineering Rock Mass on High Arch Dam Abutment of Tiger Leaping Gorge Hydroelectric Power Station;
金沙江虎跳峡水电站高拱坝坝肩工程岩体变形稳定性的数值模拟研究
12.
Crack treatment on concrete arch dam of Xiakou Hydropower Station
峡口水电站工程混凝土拱坝裂缝处理
13.
The Multiple Arch-Cantilever Safety-based High Arch Dam Stress Analysis
基于多拱梁分载法的高拱坝应力分析
14.
Study on thrust angles of high arch dam abutment during overloading
超载过程中高拱坝坝肩推力角的研究
15.
Study on the Static Characteristics of the High Arch Dam Body and the Vibration Induced by Discharge Flow;
高拱坝坝身静力特性及泄洪振动研究
16.
Static and Dynamic Stability Analysis of Xi Luodu High Arch Dam Abutment;
溪洛渡高拱坝坝肩静动力稳定性分析
17.
Numerical Simulation Analysis on Seepage Field for Wan Jia Kou Zi Arch Dam Foundation
万家口子拱坝坝基渗流场有限元数值模拟分析
18.
Safety Analysis and Simulation of Flood Discharge of High Arch Dam and Counter-arch Plunge Pool;
高拱坝及反拱水垫塘结构泄洪安全分析与模拟