1.
STUDY OF INFLUENCE OF SOIL PLUG ON DRIVING PILES OF OFFSHORE OIL DRILLING PLATFORM
![点击朗读](/dictall/images/read.gif)
海洋采油平台打桩工程中土塞效应研究
2.
a steam (hand) pile driver
![点击朗读](/dictall/images/read.gif)
蒸汽(手工)打桩机
3.
pile driving [noisy occupation]
![点击朗读](/dictall/images/read.gif)
打桩〔高噪音工作类别〕
4.
land piling [public works category]
![点击朗读](/dictall/images/read.gif)
土地打桩〔公共工程类别〕
5.
Application and Prospect of Impacting Drillerin Pile Foundation Engineering
![点击朗读](/dictall/images/read.gif)
桩基工程中冲孔打桩机的应用及展望
6.
Post Grouting for Hand Dug Piles with the Pipe Driven at the Pile End
![点击朗读](/dictall/images/read.gif)
人工挖孔灌注桩桩底打管后注浆技术及应用
7.
The workers rammed piles into a riverbed.
![点击朗读](/dictall/images/read.gif)
工人们把木桩打入河床内。
8.
Application of GPS-RTK Positioning System for Piling
![点击朗读](/dictall/images/read.gif)
GPS-RTK打桩定位系统在施工中的应用
9.
The sea work engineering GPS long-distance the piling fixed position system converts
![点击朗读](/dictall/images/read.gif)
海工工程GPS远距离打桩定位坐标系统的换算
10.
Wave Equation Analysis and Design Method of Driven Pile for BOHAI Drilling Platform Engineering;
渤海钻井平台桩基工程打入桩波动分析及其设计方法
11.
driver-extractor vibratory hammer
![点击朗读](/dictall/images/read.gif)
打桩拔桩两用震动锤
12.
Bored piling shall be used for the pumping station and bridges for the Projects.
![点击朗读](/dictall/images/read.gif)
钻孔式打桩应用于工程项目中的抽水站和桥。
13.
Widely used in the seas, rivers, marshes and land piling foundation construction.
![点击朗读](/dictall/images/read.gif)
广泛用于海洋、江河、沼泽、陆地上的打桩基础施工。
14.
Testing and Evaluation of the Affect of Piling Construction to the Buildings Around
![点击朗读](/dictall/images/read.gif)
打桩施工对周围建筑影响的测试与评定
15.
Cofferdams are made by driving metal sheet piling into the Bed to form a watertight fence.
在近代工程中,筑围堰时一般先打下钢板桩以形成阻水层。
16.
Reason Analysis of Reinforcing Cage Up-floating in Construction of Tubes-sinking Poured Pile with Redriving Method
复打法沉管灌注桩施工中钢筋笼上浮原因的分析
17.
Experimental study on burying technology of fiber grating sensor system in driven pile
![点击朗读](/dictall/images/read.gif)
光纤光栅传感系统在打入桩中的埋设工艺试验研究
18.
Talking about Pile Driving Effects into Account,Calculation of Design of Interval Between Piles for Reinforcement of Weak Foundation
考虑打桩效应CFG桩加固软基桩间距设计计算