说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 设备合格证
1.
machinery certificate
机器证书机械设备合格证
2.
Lloyd's refrigerating machinery certificate
劳埃德冷冻机械设备合格证
3.
International Commission for Conformity Certification of Electrical Equipment
国际电气设备合格认证委员会
4.
marine electronics certificate
船舶电子仪器合格证书航海电器设备证书
5.
"Specification, Performance, Guarantee Indices and Warranty for the Contract Equipment, Contract Plant and Contract Product"
合同设备、合同项目和合同产品的规格、性能、保证数值
6.
"The Seller shall supply the Contract Equipment listed in Appendix 1. The technical specification, performance and guarantee indices of the Contract Equipment are specified in Appendix 3."
卖方所供应的合同设备见附件一,合同设备的规格、性能和保证指数见附件三。
7.
The term "IC:"before the certification/ registration number only signifies that registration was performed based on a Declaration of Conformity indicating that Industry Canada technical specifications were met.
“IC”指设备取得认证号前,此设备的注册号是基于符合加拿大行业技术标准规格的声明发放的。
8.
All deck machinery and ship's equipment must be provided with qualified certificate, The item need to be inspected by class shall be provided with the classification society certificate.
所有甲板机械与船舶设备必须提供质量合格证书,需经船检部门检验的项目需提供船级社证书。
9.
Rebuilding the management flow of equipment;combining equipment testing;improving the manament level of equipment;
再造设备管理流程结合设备验证 提升设备管理水平
10.
The List of the Itemized Price for the Contract Plant
合同设备各分项的价格表
11.
It is for sure that qualified pretreatment is a must for the operation of device.
当然,合格预处理为设备运行的必需。
12.
Covered Warrants with Combined Reset Rights on Strike and Maturity;
具有执行价格和到期日重设型备兑权证的最佳重设策略
13.
"At the expiration of the Warranty Period, the buyer shall issue a certificate for the expiration of the Warranty Period of the Contract Plant in one (1) original and one (1) duplicate copy."
保证期满时,买方应签署合同设备保证期满证书正本、副本各一份。
14.
4 On successful completion of the Acceptance Test of the Contract Equipment, the Acceptance of the Contract Equipment shall be granted in the form of Equipment Acceptance Certificate signed by representatives of concerning parties.
合同设备验收测试成功,有关方面代表即应签署设备验收证书以示对合同设备的接受。
15.
the quality or state of being ineligible.
不具备某种资格,不合格。
16.
The equipment will be sold at the reasonable price with allowance made for depreciation of the equipment.
考虑到设备的折旧因素,其出售价格会定得合理。
17.
Check interrelated system and equipments have been installed, and checked eligibility.
检查相关的系统及设备已安装完毕,并检验合格。
18.
An Inquiry into the Fusion of Curriculum Design and Professional Credentials in Higher Professional Colleges;
高职院校课程设置与资格证书融合的探索