说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 小浪底水利枢纽
1.
The key water projects at the Three Gorges on the Yangtze River and at Xiaolangdi on the Yellow River
长江三峡和黄河小浪底水利枢纽工程
2.
A Crucial Project for Harnessing the Yellow River:Xiaolangdi Multi-purpose Dam Project
治理黄河的关键工程——小浪底水利枢纽
3.
Study of Pressure Control Methods Through Impounding Water for the Gates of the Xiaolangdi Reservoir;
小浪底水利枢纽水工闸门充水平压方式研究
4.
Retrospection and consideration on the resettlement of Sanmenxia and Xiaolangdiprojects in the Yellow River
三门峡、小浪底水利枢纽移民安置的回顾与思考
5.
Study of Xiaolangdi Multipurpose Dam Project Recreational Development and Management;
小浪底水利枢纽工程旅游开发与管理研究
6.
The Study of Management System of the Xiaolangdi Multipurpose Dam Project Management Bureau;
小浪底水利枢纽建设管理局管理体制研究
7.
Study on Seepage in the Dam Base of Xiaolangdi Project on Yellow River;
黄河小浪底水利枢纽工程大坝坝基渗流分析
8.
Ground Deformation Monitoring Technology and Its Application in Xiaolangdi Multipurpose Project;
小浪底水利枢纽外部变形监测技术研究
9.
All-stage Investment Control of the Xiaolangdi Multipurpose Dam Project;
小浪底水利枢纽工程的全过程投资控制
10.
Analysis on Effects of Xiaolangdi Reservoir to the Activity of Faults
小浪底水利枢纽对断层活动性的影响分析
11.
Analysis of properties and causes of deformation of the Xiaolangdi Hydro Project dam
小浪底水利枢纽大坝变形特性及成因分析
12.
Benefits and experience of Xiaolangdi Multipurpose Dam Project by use of foreign loan;
小浪底水利枢纽工程利用国外贷款的成效及经验
13.
Treatment for oil and water penetration in anchorage chan-nel of sand discharge tunnel,Xiaolangdi key water control project
黄河小浪底水利枢纽排沙洞隧洞锚具槽渗油渗水处理
14.
Study on Methods Used for Analyzing Adjoining Rock Stability of Underground Hydroplant in Xiaolangdi Project
对黄河小浪底水利枢纽地下厂房围岩稳定性分析方法的研究
15.
Measures for prevention of silt plug and abrasion in Xiaolangdi Hydro Project
小浪底水利枢纽工程预防泥沙淤堵和磨蚀的工程措施
16.
Contract price adjustment system and method of Xiaolangdi Multipurpose Dam Project;
小浪底水利枢纽工程的合同价格调整体系与方法
17.
A Procasting Analysis Study on XIAO LANG DE Water Control Project During Operation;
小浪底水利枢纽运行管理财务经济预测分析研究
18.
China's trans-century super large water conservancy project-the Xiao Langdi Water Conservancy Project on Yellow River was completed in2001.
中国跨世纪的特大型水利工程黄河小浪底水利枢纽已于2001年度全部竣工。