说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 短周期地震计
1.
To monitor earthquake activities in the vicinity of Hong Kong, the Observatory operates a network of eight short-period seismograph stations.
天文台在香港境内设有8台短周期地震计,用以监测香港邻近地区的地震。
2.
The calculation program for the seismic detector constant in short period record recorded with pen
短周期笔绘记录地震仪常数计算程序
3.
vertical-component high-gain short-period seismometer
垂直方向高增益短周期地震仪
4.
Near realtime monitoring the change of group velocity of short-period surface wave via seismic noise analysis
利用地震噪声准实时监测短周期面波波速变化
5.
Short-term and imminent earthquake prediction shall be released by the people's governments of provinces, autonomous regions and municipalities directly under the Central Government in accordance with the procedures prescribed by the State Council.
地震短期预报和临震预报,由
6.
CERTAIN SHORT TERM ANOMALOUS VARIATIONS OF THE CHARACTERISTICS OF SEISMIC WAVES BEFORE THE KUERLE EARTHQUAKE ( M=5.8)
库尔勒5.8级地震前地震波特性的某些短期变化
7.
OBSERVATION AND ANALYSIS OF THE STRESS WAVE FOR A SHORT TERM AND IMMEDIATE EARTHQUAKE PRECURSOR
地震短期、临震前兆应力波的观测与分析
8.
AN APPLICATION OF PROBABILITY METHOD TO THE SHORT TERM EARTHQUAKE PREDICTION
概率方法应用于地震短期预测的探索
9.
seismometer free period
地震检波器自由振荡周期
10.
STUDY ON PRE-SLIP PRECURSOR OF THE EARTHQUAKE--LONG PERIOD PRECURSORY SEISMIC WAVE
预滑与地震前兆——长周期波动研究
11.
Periodic slow earthquakes from the Cascadia subduction zone
卡斯凯迪亚消减带的周期性的慢地震
12.
Varying Period Predictive Deconvolution of Imaging Gathers
地震成像道集域的变周期预测反褶积
13.
it was not possible to complete the computation in a single pass.
新型计算机的操作周期短。
14.
The design method has successfully solved the problem of design and matching of Swivel Table for Sand-Dirt Wind Tunnel.
所提出的设计方法成功地解决风洞转台的设计与匹配问题,有效地缩短了设计周期。
15.
Study on comprehensive criteria for the medium and short term earthquake anomaly in East China
华东地区中短期地震异常综合判据研究
16.
ANALYSIS ON SHORT-TERM PRECURSORY ANOMALOUS FEATURES OF UNDERGROUND FLUID IN QILIANSHAN MOUNTAIN EARTHQUAKE BELT
祁连山地震带地下流体短期前兆异常特征分析
17.
The largest shock of this cluster occurred just after a short quiet period.
这群地震中最大的一个地震恰巧发生在一个短的平静期之后。
18.
Effect of Protruding Topography on Characteristic Period of Ground Motion
平台地形对地震地面运动特征周期值的影响