说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 地下坝
1.
Experimental Research on High Jet Grouting and Mould Vibrosinking of Underground Dam of the Wanghe River
王河地下坝高喷灌浆与振动沉模试验研究
2.
Analysis on change pattern of groundwater seepage in the right abutment of Hunanzhen dam
湖南镇大坝右坝肩地下渗流变化规律分析
3.
Assessment of aseismic stability of pavement plate on downstream slope of embankment dam
土石坝下游坝坡砌块在地震作用下的稳定性评价
4.
The Impact of Sight Rubber Dams on Groundwater Levels of Huangshan City
黄山市景观橡胶坝对地下水位的影响
5.
Study on the Engineering Geological Property of Deep Overburden in the Qizong Hydroelectric Power Station, Jinsha River
金沙江其宗水电站下坝址坝基深厚覆盖层工程地质研究
6.
Coupling Analysis of Elevator Shaft Structure and Arch Dam under Earthquake
地震作用下的电梯井结构与拱坝坝体的耦联分析
7.
The application of satellite remote sensing technique in the survey of soil erosion in northwest hebei
冀西北地区(坝下)土壤侵蚀卫星遥感应用研究
8.
Chaotic analysis of nonlinear response of dams under earthquake
地震荷载作用下大坝非线性响应的混沌分析
9.
Basic Features of Groundwater Flow in the Anba Ore Block in the Yangshan Au Ore Belt
甘肃阳山金矿带安坝矿段地下水流的基本特征
10.
Study of the Worst Seismic Motion Input for Earth-dam Seismic Stability under the Oblique Incidence Condition;
倾斜入射条件下土石坝最不利地震动输入研究
11.
Study on the Seepage Control Schemes of the Dagang Mountain High Arch Dam and Underground Powerhouse;
大岗山高拱坝及地下厂房渗流控制方案研究
12.
The Working Characteristics of Cemented Sand and Gravel Dam on Different Foundation;
不同地基条件下胶结砂石料坝工作特性研究
13.
Surrounding Rock Stability Analysis and Support Design Study for Xiangjiaba Underground Powerhouse;
向家坝地下厂房围岩稳定分析和支护设计研究
14.
Discrimination and Finite Element Analysis of Dam Foundation Liquefaction under Earthquake Excitation;
地震作用下坝基土体液化的判别及有限元分析
15.
Analysis and Computation on 3D-Still Stress and Strain of Soil-Rock Dam in Xiaban Zone;
下坂地土石坝三维静应力与变形计算分析
16.
The groundwater chemical characteristics in the Yaoba oasis of Alxa area,Inner Mongolia
内蒙古阿拉善腰坝绿洲地下水水化学特征
17.
Dynamic Response Analysis on Asphalt Concrete Core-wall Dam of Xiabandi Reservoir
下坂地沥青混凝土心墙坝动力反应分析
18.
Curtain Grouting Test at Underground Powerhouse at Right Bank of Xiangjiaba Dam
向家坝水电站右岸地下厂房帷幕灌浆试验