1.
Report Form on the Progress of Works to Improve Water Quality along the Dongshen Basin
东深流域水质处理工程进度表
2.
draw up a program(me) of work
拟定课程表[工作进度表]
3.
We should work according to the overall schedule chart( the construction time schedule) of the project.
我们应该按照工程项目的总进度表(设进度表)作。
4.
155 We should work according to the overall schedule chart(the construction time schedule )of the project.
我们应该按照工程项目的总进度表(建设进度表)工作。
5.
development programme
发展进度表;发展进度计划;发展计划;建筑工程时间表
6.
determine production schedule
决定生产日程进度表
7.
plan a schedule
定好时间表/日程/进度
8.
a whiz-bang schedule
快而精彩的行程表(进度表)
9.
Responsible for producing engineering and design deliverables necessary for project and proposal execution. Prepares and delivers work packages according to schedule. Salary grades and titles will depend on experiences.
负责项目和投标执行的工程和设计交付。根据进度表准备并完成工作。根据经验确定工资和职称。
10.
Monitoring control of cost and progress in the stage of construction for the project item
工程项目施工阶段进度与成本的监控
11.
Study on Construction-Schedule Early-Warning Model of Waterlocks Key Project;
水闸枢纽工程施工进度预警模型研究
12.
Engineering Construction Progress Control of Qingdao Dacun River;
青岛市大村河工程施工进度控制研究
13.
Discussion on speeding up process of final account of large water project;
加快大型水利工程竣工决算进度探讨
14.
New Consideration on Designing Unit Construction Schedule;
编制单位工程施工进度计划的新思路
15.
Evaluation of Construction Progress Risk Using PERT Method in Huge Bridge Project
PERT法评估特大桥梁工程施工进度风险
16.
Establishment of Jordan AMCP Cement Project Schedule Plan and Analysis of Influencing Factors on Schedule;
约旦AMCP水泥项目工程进度计划的编制及工程进度影响因素分析
17.
Conduct engineering design, insure project meets established schedule, cost, quality.
负责工程设计,控制项目进度,成本以及工程质量。
18.
A stopwatch is used to obtain the optimum procedure.
秋表用来控制最佳工作进程。