说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 机组启动
1.
STUDY ON ALLOCATION OF UNIT START-UP COSTS UNDER POWER MARKET ENVIRONMENT;
市场机制下机组启动费用的分摊研究
2.
Research of Thermal Stress Control of the Startup Process for the Steam Turbines;
热应力控制汽轮机组启动过程的研究
3.
Study on the Characteristics of Start-up of the 600MW Ultra-supercritical Generating Unit
600MW超超临界机组启动特性研究
4.
Analysis on Start-up Mode of 600 MW Direct Air-cooling Unit
600MW直接空冷机组启动方式分析
5.
Vibration Analysis of Domestic 600MW Super-crititial Steam Turbo-set
国产600MW超临界机组启动过程振动特性分析
6.
Vibration Analysis and Elimination During Start-up of 220 MW Turbine-Generator Sets
220MW汽轮发电机组启动过程振动分析与消振研究
7.
Analysis and Adjusting the Vibration of 220 MW Turbine-generator Set in the Process of Start-up
220 MW汽轮发电机组启动过程振动分析与调整
8.
The Control Way of Water and Steam Quality for the New Erecting Units During Trial Operation
基建机组启动过程中水汽质量控制途径
9.
The Development of an Operation-Guidance Expert System for a 300MW Steam Turbine Starting-up Process;
某300MW合缸机组启动操作指导专家系统的研发
10.
Economic performance analysis of power generation companies future transactions with Generators start-up cost taken into consideration;
基于机组启动费的发电公司期货交易经济效益
11.
Thermal Stress Calculation and Start-up Optimize of Intermediate Pressure Cylinder Start of 300MW Steam Turbine;
300MW机组中压缸启动热应力计算与启动优化
12.
You must reboot the machine before this component can be removed.
删除这个组件前,您必须重新启动机器。
13.
You must reboot the machine before this component can be added.
添加这个组件前,您必须重新启动机器。
14.
"Apply Group Policy for computers asynchronously during startup"
"在启动时为计算机异步采用组策略"
15.
Start-up of 350 MW Supercritical Unit Without Fuel Oil
350MW超临界机组的无油启动试验
16.
New methods for overall start-up of generator-transformer sets
发电机变压器组整套启动新方法探讨
17.
On-line Confi guration the Logic of Regulating-valve Open Sequence Reducing the Vibration of Turbine Axle
在线组态调门开启逻辑减小汽轮机组大轴振动
18.
Analysis of start-up mode by using single-side fans for super-critical unit
超临界火电机组故障状态下单风机启动